Extension to the house - how to quickly and inexpensively make it from available materials. Expanding a frame house: the nuances of constructing an extension to a house Extension to a wooden house for a bathroom

Building a new residential building is an expensive and, to some extent, risky undertaking. Another issue is expanding an existing building to increase usable area. Add an extra room to country house or cottage will cost much less than building everything from scratch. But this does not mean that designing and installing a new room is a simple matter; you will encounter a lot of pitfalls along the way. To avoid mistakes, we suggest that you familiarize yourself with the recommendations on how to make an extension to your house with your own hands and at minimal cost.

How to make an extension

To answer this question, you will have to engage in design, which is where any construction begins. Sketch a plan of the old building to scale, determine the location of the attached room and put it on the drawing. After thinking about internal layout new part, you can accurately determine its dimensions. Draw a side view to get an idea of ​​how much headroom you have based on roof slopes.

Important point. Careful drawing and verification with actual dimensions on site will allow you to avoid unpleasant mistakes associated with the size of the part being built, its height and especially the slope of the roof. Minimum angle roof slope - 8°, you cannot do less, otherwise leaks will appear after rain and snowfalls.

A full-fledged project must include material for the construction of an extension. Its choice depends on the purpose of the new room:

  1. A full room with access to the hallway, equipped with heating and other communications - bedroom, kitchen, bathroom or toilet. This is a permanent structure built from brick, aerated concrete, foam block and their combinations. Timbers such as timber and logs are also suitable.
  2. Light extensions - veranda, open terrace, vestibule or porch with a polycarbonate canopy. It is better to build such premises on a frame made of wood or metal structures, sheathed OSB boards followed by finishing. The greenhouse and winter garden are made of glass.
  3. Outbuilding to the house - barn, garage, boiler room. These structures can be both capital and lightweight; the choice of material depends on your desires and capabilities. Common options are cinder block, shell rock and wood. A more progressive solution is sandwich panels with insulation on a rolled metal frame.
  4. A separate question is what to use to make an extension to the balcony of an apartment building on the first floor. The answer is simple: the same partition must be adjacent to the brick wall so that the structure does not fall out from the exterior of the building. Near panel house You can use any stone blocks, but then they will have to be finished to match the color of the surrounding walls.

Note. Regarding the building materials used, not requirements are listed, but recommendations. You are free to make an extension at your discretion, for example, build brick building near log house. But such solutions are more difficult to implement, and most importantly, more expensive.

How to make a foundation for an extension

For attached premises, 4 types of foundations are used depending on the weight of the structure and the quality of the soil:

  • columnar - for lightweight structures on a wooden frame;
  • pile-screw foundation used on subsidence soils for the installation of structures made of wood and metal with low mass;
  • tape - for heavy stone buildings;
  • a reinforced concrete monolithic slab is poured over the entire area of ​​the attached part, built from bricks or blocks on unstable soils.

Example of a columnar concrete base

Advice. Modern frame houses are increasingly being placed on screw piles. If this is your case, then the choice of foundation is obvious - a pile-screw foundation; it makes no sense to use another type.

Solid concrete slab used quite rarely due to high cost, and twisting screw piles It is better to entrust it to professionals in this field. To independently build a light veranda or summer gazebo, a columnar base is recommended. For brickwork or aerated concrete walls, it is better to pour a concrete strip; we will consider these 2 methods further.

Traditional strip foundation

Columnar base

A properly made foundation of this type is cheaper than tape and is well suited for light buildings. Its construction begins with marking the area and designating the installation points for future vertical frame posts. The pillars, and therefore the soles for them, should be placed in increments of 1.5 m, as shown in the diagram.

The further procedure is as follows:

  1. Dig square holes measuring 50 x 50 cm at the designated points, going 70-80 cm deep. The task is to place a support on dense, stable soil, so the bottom of the pit needs to be compacted.
  2. Add 15 cm of sand or fine gravel and compact again. Fill a platform at the bottom with M150 concrete, and after hardening, cover it with roofing felt in 2 layers (waterproofing).
  3. Lay out square posts 38 x 38 cm from red ceramic bricks to the required height.
  4. Apply bitumen primer to the walls of the posts or stick on built-up waterproofing. Place the roofing material on the top of the support again.
  5. Fill the gaps around the foundation with earth and compact them lightly.

Reference. Foundation pillars for a frame extension can be cast from M200 concrete, but then you will have to install formwork and knit reinforcement mesh.

Strip foundation device

Under this type of foundation you need to dig a trench along the contour of the future room, as shown in the photo below. The width of the ditch should be made 15 cm greater than the thickness of the wall made of brick or foam block. The depth depends on the location of the stable layer of soil and ranges from 50-100 cm. The walls of the pit must be cleaned, and the bottom must be compacted and a sand cushion 100 mm thick must be poured.

Advice. When digging a trench, focus on the depth of the foundation of a private house (if it is reinforced concrete or block). The rubble foundations of very old dwellings can be buried less, so you should not rely on them.

The work order is as follows:

  1. Compact the poured sand and install a wooden panel formwork with external supports and internal braces (possibly from studs with nuts), preventing the sides from moving under the weight of the concrete. The height of the formwork is not lower than the level of the base of the existing building.
  2. Tie or weld frames from corrugated reinforcement with a diameter of 8-12 mm to make cells 10 x 15 cm. Install them in a trench on stands 50 mm high.
  3. Prepare concrete mixture M150 in the following proportions: cement M400 - 1 part, dry sand - 3 parts, crushed stone with a fraction of up to 40 mm - 5 volumes.
  4. Fill the strip foundation layer by layer to the height of the base of the house. It is highly advisable to compact concrete using special vibrators (rent them).
  5. Remove the formwork after 7 days, and continue work after 3 weeks, when concrete mixture will harden.

Advice. To prevent concrete from losing its milk when pouring and subsequently absorbing moisture, cover the trench with formwork before installing the reinforcement cages plastic film.

If you want to make the extension warm from the beginning, then after the foundation has hardened, insulate it from the outside with polystyrene foam, or better yet, with penoplex. Lay drainage along the bottom of the ditch and fill the sinuses with soil, then cast a blind area with insulation, as shown in the diagram. For an unheated extension, treat the base with bitumen or apply waterproofing (for example, from the well-known brand Technonikol). Place roofing felt in 2 layers on top of the base and begin forming the floors. You will learn about all stages of work by watching the video:

Floor installation

The first stage of building an extension to the house with your own hands is the installation of floors, which come in 2 types:

  • flooring on wooden joists;
  • cement screed.

Note. On a columnar foundation, floors can only be built on joists, but on a strip foundation - any floors you can choose from.

The wooden floors of the extension are made using the following technology:

  1. Place wooden lintels - beams with a minimum cross-section of 10 x 15 cm - on the brick pillars and secure them with anchors. On the corner supports, join them halfway across the tree (how to do this is shown in the photo). Fasten the bars together with steel corners on self-tapping screws.
  2. Install the logs in the same way.
  3. If insulation is not required, then lay the subfloor from 40 mm thick boards.
  4. To insulate floors, nail skull blocks to the bottom of the joists, lay boards and insulation with a vapor barrier on them. Then lay the subfloors.

An example of connecting half-timber beams

To install the screed, the space inside the strip foundation is filled with earth, compacted with water. Fill the recess on top with expanded clay to a height of 20-30 cm and fill the screed. Let it harden for 2-3 days and proceed to the construction of walls.

Construction of extension walls

Construction order open veranda or porch depends on the project and design of the structure. But in any case, installation begins with the installation of vertical posts and connecting them together with horizontal jumpers. Here, wooden beams 10 x 15 cm or steel are most often used profile pipes cross section 80 x 60 mm, or 60 x 60 mm.

Reference. Builders frame houses Another technology is practiced: wall sections are assembled entirely on the ground, and then lifted and attached to the foundation and to each other.

It is better to join the beams in half a tree or in a groove with steel corners fixing them on self-tapping screws, as shown in the diagram. At the top, the pillars are united by a horizontal beam, where the roof rafters will subsequently lie. The ends of this lintel are securely attached to the wall of your home. A cold extension can be immediately lined with OSB boards, which will strengthen the frame. The heated room will need to be insulated with mineral wool 100 mm thick. For more information about the construction of frame walls, watch the video:

The main walls of the extension are built from bricks or blocks according to all the rules of masonry - with bandaging of the seams and checking the vertical. The first row is laid around the entire perimeter, and then you need to form the corners, raising them by 4-5 rows. Next, a wall is built to the same height, after which the action is repeated.

Advice. Connect brick or block masonry to the walls of the house by drilling holes through 2-3 rows and inserting reinforcement with a diameter of 6-8 mm into them.

Roof installation

As a rule, the roof of the extension is made on wooden beams supported by the existing wall of the house and the new partition. The algorithm of actions is as follows:

  1. Anchor a horizontal board with a thickness of at least 50 mm to the wall of the building to support the rafters. In a stone extension, lay the same boards on top of the walls and secure them.
  2. Install rafters from boards 15 x 5 cm (minimum cross-section) in increments of 600 mm to match the size of the insulation board. Screw them to the supports using steel angles and self-tapping screws.
  3. Place waterproofing - a diffusion membrane - over the beams with an overlap of 10 cm and nail it to the rafters with planks.
  4. Lay the roof covering - slate, metal tiles or corrugated sheets. In order for water to drain properly from the roof, the slate must be placed under the roof overhang of your home.

Simple rafter system for a wooden extension

If necessary, insulate the roof of the extension by inserting mineral wool slabs between the beams at random. Add insulation to the bottom vapor barrier film and sew it up facing material. More information about installing the roof of the extension is described in the video:

Conclusion

It is better to carry out all work on the construction of an extension to the house with an assistant; many operations are inconvenient to perform alone. You can handle a one-story structure without any problems, you just need to allocate time. Don’t forget to treat the wood with an antiseptic compound and paint it well so that the frame of the veranda or porch will last for many years.

Design engineer with more than 8 years of experience in construction.
Graduated from Eastern Ukrainian National University them. Vladimir Dal with a degree in Electronics Industry Equipment in 2011.

Related posts:


Over time, some private buildings require expansion for various reasons. For example, an increase in the number of occupants, a sewer system installed in the house, or the need to close front door from direct exposure to cold. Therefore, there is a need for an additional room, expanding the kitchen, creating a room for a bathroom, or simply building a veranda.

A do-it-yourself extension to a house can be made of wood, brick, or a combination that includes several building materials.

Premises requirements

To avoid having to make additional changes to the attached room, it is better to immediately think through all the nuances of the extension, since each of them requires a special approach.

Additional room

If you need to add another living room to the house, you will have to try, since this work is almost equivalent to building a small house. The floors, walls and ceiling of the building must be well insulated, otherwise the heating installed in it will not be effective - this is one of the main conditions for a living space. The second important condition for normal living is the absence of dampness in the room, which means reliable waterproofing is needed.

Kitchen or bathroom

When constructing these premises, before installing the foundation, utilities are brought to the construction site - in particular - sewer pipes. You may have to install the water supply separately.

In addition, it is also worth paying attention to the insulation of all elements of the structure, and think about reliable waterproofing of the floor.

Veranda

A veranda is a lightweight structure that mainly serves to protect the main entrance to the house from wind and rain or is used for summer recreation. It may be closed, have a door and one or more windows, and May be and completely open, that is, it consists of a flooring, low walls and a roof raised on pillars.

This structure does not require special insulation, but it will still be necessary to waterproof the foundation.

Construction of the foundation for the extension

The foundation for the extension can be strip, made of brick or stone blocks, or columnar. Each of them has its own advantages and disadvantages. To settle on one of them, you need to find out how each structure works and choose the one that is more suitable for a particular extension.

Information about building the foundation

Strip foundation

So, the strip foundation is arranged in the following sequence:

  • First you need to mark and trace the place where the extension will be installed. This is done using a rope, which is stretched on the ground and secured with pegs.

  • Next, following the markings, a trench is dug to the same depth as the foundation of the entire house. Before pouring concrete, it would be a good idea to secure the reinforcement that connects the foundations of the main building and the extension.
  • The width of the trench should be 100-150 mm greater than the planned wall thickness.
  • After the trench has been dug, further preparation begins. First, the bottom is filled sand cushion 100-120 mm thick. It must be compacted thoroughly.
  • The next layer is filled with crushed stone or broken brick, which is also compacted with a hand tamper.
  • Next, waterproofing is laid in a trench along the entire perimeter, which should extend to the ground surface by 40-50 cm, since it should cover not only inner part foundation, but also formwork for its above-ground part.
  • A welded reinforcement structure is installed on the waterproofing film, which should follow the shape of the foundation, and over its entire height.
  • Then the reinforcement is poured with a rough concrete solution of cement and gravel to ⅓ of the height of the trench, and after this layer hardens, the next one is poured to one-half of the remaining height.

Installation of formwork for strip foundations
  • After filling this layer, you can work on the device wooden formwork to form the above-ground part of the foundation - the plinth. The waterproofing film is left inside the formwork, spread along its walls and secured on top of them so that it does not slide into the concrete.
  • Concrete is poured into the prepared formwork to the top. Then the solution is pierced in several places with a shovel so that there are no air cavities left inside it. You can lightly tap the formwork - such vibration will help the concrete to compact as much as possible.

  • Having completed pouring the foundation, the concrete is leveled to the required level and left to dry, spraying with water daily to strengthen it.
  • After the concrete has completely hardened, the formwork is removed and the foundation is waterproofed from the outside.
  • Before starting the construction of walls, it is recommended to additionally cover the foundation with waterproofing compounds or roll materials. For this process use liquid rubber, tar, bitumen mastic and roofing felt.

  • The space inside the strip foundation can also be equipped in different ways - concrete screed or a flooring of floor beams and joists with a wooden floor installed on them.

Video - construction of an extension to a house on a strip foundation

Columnar foundation

In addition to a strip foundation, a columnar foundation can be constructed, which is built from brick or concrete, or a combination of these materials. This option is mainly used for the construction of verandas or additional living rooms, since communications associated with water supply or drainage in an uninsulated or even open underground will require additional thermal insulation.


A columnar foundation is most often installed if it is planned to install a boardwalk.

The work is carried out in several stages:

  • The first step is marking the area chosen for the extension. The pillars should be one and a half meters apart from each other.

  • Excavations are dug for each pillar separately. Their depth should be 500-600 mm, with a square side of 500 × 500 mm. Towards the top, the pits should widen slightly - about 100 mm on each side.

Foundation pillar installation diagram
  • Next, the bottom is strengthened in the same way as when installing a strip foundation, using sand and crushed stone, and waterproofing is laid.
  • If the support pillars will be built from brick, it is recommended to lay a layer of coarse cement mortar on the bottom. Only after waiting for it to harden do they make brickwork.
  • If the pillars are concrete, a reinforcement structure and formwork are installed at the bottom of the pits to the height of the future pillar. The waterproofing film is placed inside the formwork and secured on top of it;
  • Concrete is poured into the formwork in layers. Each layer must set well before the next one is poured;
  • The top of the column is well leveled and sprinkled with water daily until it hardens completely;
  • After the pillars are ready, the formwork is removed from them and they waterproofed roofing material, which is glued onto heated bitumen mastic.
  • Make a gap in the gap remaining between the soil and the pillars backfill, compacting every 100-150 mm of backfilled soil mixed with crushed stone.
  • Several layers of roofing material are laid on each of the pillars - it is necessary for waterproofing the wooden blocks that will be laid on top of the pillars.

Installation of the base floor of the extension

If a strip foundation is chosen, both wooden and concrete floors can be installed on it. A columnar foundation without lintels requires the installation of a wooden floor.

Concrete floor

To make a reliable and warm floor screed inside a strip foundation, you need carry out work step by step, adhering to a certain technology.

  • To begin with, excess soil is selected from inside the finished strip foundation. It is first loosened and then removed to a depth of approximately 250-350 mm.
  • A ten-centimeter sand cushion is poured and compacted onto the bottom of the resulting pit. Crushed stone can be laid on top of it, but to insulate the screed, instead of crushed stone, expanded clay is used, poured in a layer of 15-20 cm.

  • Expanded clay is leveled, and a reinforcing grid is laid on it. After its installation, a beacon system is installed on top according to the selected horizontal level. Some rooms, for example, a bathroom or an open terrace, may require a certain slope of the surface to allow water that falls on the floor to flow smoothly to the drainage system.
  • Next, lay out on the prepared surface cement mortar and is leveled using the rule. After a day, it can be covered with plastic film - then the concrete will ripen more evenly, which will give it additional strength.

When the walls of the extension are erected, any decorative coating or wooden floor.

Floor on wooden beams

  • Floor beams are wooden blocks of fairly large thickness, about 150 × 100 mm in cross-section. You cannot save on them, since the overall strength of the floor will depend on their reliability.

  • The beams are laid on pillars or strip foundations, on top of a fabricated roofing felt substrate, and can be fixed to concrete in different ways- using through fasteners, corners and other metal devices. The beams at the intersection points are also fastened together using strong corners.

  • They will hold securely because wood flooring The “black” and “white” floor also serves as a kind of binding fastening.

Video: construction of a frame extension with a wooden floor

Construction of extension walls

Brick or frame walls, columnar is mainly used for frame buildings. If you plan to make brickwork on the pillars, then you will have to make additional concrete lintels between the pillars.

Frame walls

  • The frame for future walls is erected from timber and secured to the previously installed crown beams. The beams can be attached to the beams separately, but sometimes it is much more convenient to assemble the wall elements in a horizontal position, on a flat area, and then install them in a vertical position already assembled.

  • To connect the frame to the wall of the house, a perfectly accurate vertical marking is made on it, along which a separate block or assembled frame element will be fixed.

  • For reliability, all bars are connected to each other with metal corners.

  • Having installed the entire frame of the extension, it is better to immediately sheathe it with boards or plywood (OSB) with outside. Sheathing will immediately make the structure more rigid.

  • The upper horizontal beam running along the house is attached to the main wall using reliable metal corners or anchors.
  • The walls are insulated after the roof is installed.

Video: another example of constructing a light extension to a house

Brick walls


  • Before you start building brick walls, you need to carefully check the horizontalness of the foundation surface and, if necessary, level it to perfection. If the base is uneven, the masonry may crack due to deformation during shrinkage.
  • It should be noted that brick extensions are best done to a brick house. To connect the extension to the main wall, during the construction of the walls, holes are drilled in it to two-thirds of the depth, every two or three rows of masonry. Reinforcement is embedded in them, which should protrude from the wall by about half a meter. It should be in the seams of the future masonry. To ensure that the seams in these rows are not excessively wide, the reinforcement must be chosen not too thick, or you will have to make a recess in the bricks of the row on which the reinforcement will be laid.
  • If brick extension gets a job wooden wall, then a hole is drilled through it, into which reinforcement with a transverse stopper is installed from inside the house, which will hold it in the wall. The reinforcement is also installed as the wall is erected, every two or three rows.

  • Before starting masonry, a string is stretched along the future wall, along which it will be easy to control the horizontality of the rows, and the verticality is constantly verified using a plumb line.
  • The thickness of the walls will depend on what function the extension will perform. If this is a living room, then the masonry should be at least one or two bricks. If the room will serve as a veranda or utility room, then half-brick masonry will be sufficient.
  • Having built brick walls, they are tied along the entire top with a concrete belt. Formwork is made for it, a reinforcement structure is laid in it and poured with concrete mortar. After the solution has completely hardened, the formwork is removed from the belt, and you can begin installing the ceiling.

It should be noted that building brick walls is not as easy as it seems, therefore, if you have no experience in this work, it is better to entrust this process to a qualified mason or choose a different type of wall.

Extension ceiling and roofing

After the walls are erected, it is necessary to make a ceiling. For it you will need beams - beams, which are installed on the upper part of the walls, at a distance of 60-70 cm from each other, and secured with special corners.

If the beams are laid on brick building, they can be embedded in a concrete belt, having previously wrapped the edge of each of them with roofing felt.


The next step is to line the beams with boards or thick plywood, on which insulation will be laid on top, between the beams.

The roof of the extension may have different designs, but basically the single-slope option is chosen, which is worth considering.


  • This structure consists of rafters on which the roof is laid. This type of roof is quite simple to install; the main thing is to choose the correct slope angle. It must be no less than 25 30 degrees - this is necessary in order for precipitation to winter time do not linger on the surface, otherwise they may simply damage it.
  • Having determined the slope angle, a mark is made on the wall or façade of the roof in the form of a horizontal, even line along which the block supporting the rafters in the upper part will be attached. The lower support for them will be the previously laid floor beams or the edge of the wall. The rafters should extend beyond the boundaries of the constructed walls by 250 300 mm, in order to protect the walls as much as possible from rainwater.
  • The rafters are also secured using metal corners.
  • It will be more difficult to resolve the issue of roof slope if the extension is installed on the side on which the slope of the main building of the house is located, since there will simply be nothing to secure the transverse beam there. Therefore, you may have to remove several bottom rows (sheets) roofing material from the roof of the house to use its beams to secure the rafter system and combine the general covering.
  • You need to decide in advance what kind of roofing will be laid on top of the rafter system. If this happens soft roof or flexible tiles, then a solid material is laid on top of the rafters and secured, for example, plywood or frequent transverse lathing.
  • If they become fixed large canvases(roofing iron, metal tiles, slate, etc.), then they can be overlapped with directly installed rafters.
  • When the system under the covering material is ready, it is recommended to lay waterproofing on it. In the first case, plywood is covered with it, in the second, it is fixed to the rafters.
  • The roofing material is laid on top of the waterproofing material, starting from the bottom of the rafter system and rising to the top. If it is necessary to combine the roof, then when joining, the top row of the extension roof is slipped under the last row of the roof slope of the main building.
  • If the roof is adjacent top part roof to the wall or front part of the roof, then the joint between them must be waterproofed.
  • When the roof over the erected extension is ready, you can begin to insulate the walls and floor.

Prices for metal tiles

Metal tiles

Insulating the extension from the inside

If the room is residential, then reliable thermal insulation is indispensable. If the ceiling is already sheathed and insulated, then you can proceed to insulating the floor.

Floor insulation on beams

If floor beams were installed on a columnar foundation for the floor, then the work proceeds as follows:

  • Transverse logs made of smaller bars are attached to the floor beams.
  • It is recommended to install a subfloor on the joists; in this case, it is better to lay the boards for it as a continuous flooring, otherwise the heat will be blown out of the house.

  • Next, the entire rough coating is coated with a fairly thick clay solution, and after drying, a vapor barrier film is laid on it.
  • Mineral wool is placed tightly between the joists and expanded clay or slag is poured.

  • On top, the insulation is again covered with a vapor barrier, and a wooden floor made of boards or plywood is laid on it.
  • A decorative coating can be immediately laid on the plywood, or an infrared film floor can be installed underneath it.

Concrete floor

A concrete floor can be insulated as follows:

  • Mineral wool laid between joists fixed to a concrete base and then covered with boards or plywood.
  • One of the “warm floor” systems (electric or water), which fits into the final leveling screed;
  • Infrared film laid on a thin thermo-reflective substrate, and covered with a decorative coating;
  • Dry screed and gypsum fiber slabs.

When the floors are insulated, you can move on to thermal insulation of the walls.

Frame walls

  • For internal insulation The walls use mineral wool produced in mats. They are conveniently laid between the frame bars. This work is simple and can be done fairly quickly.
  • When the walls are covered with insulation, it is covered with a vapor barrier film, securing it to the bars with staples.
  • Then the wall can be covered with natural wooden paneling, OSB boards or plywood, plasterboard or gypsum fiber board - there are a lot of options, there is plenty to choose from.

Expanded polystyrene can also be used as wall insulation, but its environmental and performance qualities are much worse than those of high-quality mineral wool.

Brick walls

Brick walls are usually finished on the inside with plaster or plasterboard, and insulation is carried out on the outside, but it is also done differently.

Insulation, if space allows, can be carried out in the same way as in a frame building, by securing bars to the walls and laying mineral wool between them, and then covering the structure with plasterboard slabs. Wallpaper or any other decorative material can be glued to this coating.

To do everything right, you need to study in detail each stage of the construction of the extension and adhere to the developed technologies. If there is no confidence in your capabilities, there is a clear lack of skills and experience in construction, it is better to entrust this sufficient difficult work qualified craftsmen.

Time passes, and it turns out that the private house no longer satisfies the owners with its size and amenities. A decision is made to expand its area with an extension. How to do this efficiently and without extra costs, we'll tell you in the article.

Save money without harming quality – requirements for premises and materials

Poorly thought out design of an extension will eventually force something to be altered or completed, or added to the country house. In order to avoid getting into such a situation, we think through all the nuances, weigh the advantages and disadvantages of our idea. We start with choosing a location and size.

Each type of additional room has its own specific characteristics in connection with its use, requirements for insulation, waterproofing, and others. If a decision is made to build an additional living room in a country house, then this is tantamount to building a small house. It is necessary to reliably insulate and prevent the appearance of dampness. If you plan to stay in cold weather, you need to think about heating.

Another common type of extension is kitchens and bathrooms. The requirements for them are practically the same. First of all, we think about utilities and install them even before construction begins. It is much more convenient to lay sewer and water pipes before pouring the foundation than to dig underneath it later. Increased attention requires waterproofing of the floor covering. We are thinking about insulation, but if the kitchen is planned for summer, then you can save on this.

The house is being expanded by adding a veranda. The structure is light, serves for summer recreation, protects the entrance from wind, snow and rain. It is performed in many variants: from the simplest in the form boardwalk, low walls with a roof on pillars, to complex with walls, doors, windows. No insulation is required, otherwise it will no longer be a veranda, but waterproofing the foundation is necessary.

The extension to the house must be in harmony with the main structure. If the house has external decoration, then it will not be difficult to repeat it in the attached room. All materials go well with wood, which looks great even without additional finishing.The best option would be a frame structure:

  • it is built quickly, literally in a few months;
  • does not require a capital foundation because it is lightweight;
  • without special knowledge and skills, it can be built with your own hands;
  • will cost less.

The foundation for the extension is made on the same level as the foundation of the house. When attaching a structure to a house, we do not do it tightly - over time it will shrink - but leave an expansion joint. In this respect they compare favorably frame structures, which do not give vertical shrinkage.

If the structure is attached to the front wall, the roof continues the main roof and is pitched. We choose the slope in such a way that the snow does not linger and the rain flows off. If this is an extension to a side wall, then the roof follows the configuration of the main one. The roofing material is the same as on the roof of the house, if different, it is important that they are combined.

Columnar base - fast, cheap, reliable

For columnar foundation Extensions to the house use concrete, brick or a combination of both. It is made mainly for a living room or veranda. If used for a kitchen or bathroom, thermal insulation of the utility lines entering the house will be required. Since the protection concerns an average of half a meter of pipes, such expenses can be incurred, and it will still be cheaper than a strip foundation. The floor is made of boards; for concrete, you will need a lot of backfill material and a fence around the perimeter.

We start by marking the area, the installation locations of the pillars are one and a half meters from each other. A separate hole of 50x50 cm is dug under each pillar, with a depth greater than freezing of the soil. At the top we expand the pits a little: about 10 cm on each side. We fill the bottom with a 10 cm layer of sand, carefully compact it, then crushed stone or broken brick, which is also compacted.

We lay out the film for waterproofing and bring the ends to the surface. If we plan to build brick pillars, pour a little bit into each hole. concrete mortar for the base and wait for it to set. When planning concrete pillars, we tie reinforcement at the top along the entire height and lower them into the pits. We provide equal distance between the walls. We place pieces of brick under the bottom to raise the reinforcement by about 4 cm.

We make formwork for the base, inside which we run the film. We pour the concrete in layers, pierce each layer several times with a rod to release air bubbles. It is important not to rush, it is better to wait until it sets, then continue pouring. We carefully level the top of the column and wait about two weeks until the concrete hardens. All this time, water heavily and cover with burlap or film.

When the foundation reaches the required strength, the formwork is removed. We heat up the bitumen mastic, apply it to the pillars and immediately glue pieces of roofing felt for waterproofing. There is space left between the pillars, which it is advisable to fill in to insulate the floor. We use ordinary soil mixed with crushed stone or pieces of brick. Fill in layers of 10 cm, tamp. The technology for constructing a strip foundation is practically no different, but unlike a columnar foundation, it is solid.

Getting started - bottom frame and extension floor

So, we settled on the frame option as the fastest and cheapest. In order for wood to serve for a long time, you need to adhere to two rules: make reliable waterproofing and carry out antiseptic treatment. Of course, the wood must be well dried. For waterproofing the most reliable means– bitumen mastic. It is possible to use several layers of roofing material, but it is short-lived.

Then we make the bottom trim. Usually 150x150 mm timber is used, but it is possible to use 150x50 mm boards. We lay them horizontally along the entire perimeter, aligned with the outer edges of the foundation. We do not connect the boards of the first row to each other. We lay the second row on top, overlapping the joints in the first.

In the boards laid in this way on the foundation, we make through holes for the studs and connect them. If it is strip, we drill and connect it on the ground, and then lay it down. To get the effect of a single beam, we knock it down with nails in a checkerboard pattern every 20 cm. The result is a binding of the required thickness, which also has additional advantages:

  • costs much less than beams;
  • It’s very easy to connect them together, but with bars it’s more difficult.

We attach the bottom frame to the beds from the same 150x50 mm boards, installed on top of the edge along the outer edge. We fasten them together and with the beds with 90 mm nails. Next we install logs made of similar material installed on the edge. The distance between them is 60–80 cm, but it all depends on the size of the frame extension: the longer the logs, the narrower we install them. They are attached to the trim board with nails, 2 on each side.

Now let's start insulating the floor. The cheapest, although not very eco-friendly option– tiled polystyrene foam with a density of at least 15 kg/m3. Its advantage is that it is the only insulation material that is not afraid of moisture. We nail 50x50 mm bars to the lower edges of the logs, which will hold the polystyrene foam. A thickness of 15 cm is required: we use sheets of 10 and 5 cm. We lay them so that the seams of the bottom and top rows overlap.

The base is ready. We lay the subfloor on top. To prevent it from warping over time, we lay it alternating the direction of the annual rings. We look at the cut: we place one board with an arc up, the other - down. We make the finishing floor from plywood, the joints are staggered. A rough base is not necessary if there are edged tongue-and-groove boards with a thickness of 30 mm or more or 15 mm plywood. We lay it directly along the joists.

Wall installation - two assembly technologies

There are two assembly technologies frame buildings. The first is called frame-panel, when the entire assembly is carried out on the ground, then the finished structures are installed in place and fastened together. Sometimes the frame is immediately sheathed, which makes it even stronger. Another method involves gradual installation on site. Which one is more convenient - everyone decides for himself. A shield assembled on the ground cannot be lifted alone; assistants will be needed.

We begin the construction of the frame with the corner posts. For them and intermediate posts we use timber 150×150 mm or even 100×100 mm. The distance between the racks is determined by the width of the insulation, which we find out in advance. We position the pillars so that the gap between them is 3 cm narrower than the width of the insulation. This way we will save on waste-free use of material and improve the quality of insulation without leaving gaps.

Fastening can be carried out simply and reliably using metal corners installed on both sides of the racks and secured with stainless screws. Before finally fixing the stand, we carefully check its verticality, this is especially important for the corners. One incorrectly aligned beam will cause the entire extension to bend.

Temporary bevels, which are installed from the inside and serve until attachment, help maintain the correct shape of the frame. external cladding. If the sheathing is made of a rigid and durable material such as plywood, OSB, GVK, it is capable of independently strengthening the base, which will stand securely after removing the temporary slopes. When soft material is planned for the cladding: siding, lining, then permanent braces cannot be avoided. It is better to install them two at the bottom and at the top of each rack.

At the places where windows and doors are installed, we attach crossbars. We make the racks next to them double: they experience increased loads and must be stronger. The final fastening of the frame is carried out by installing the upper trim. In order not to invent anything, it can be similar to the bottom one: a bed made of two boards fastened together and the actual harness made of the same boards installed on the edge. To it, in the same way as the floor joists were attached, we nail the floor beams from 150x50 boards on the edge.

We constantly check the geometry of the entire structure, as well as the correct installation of the racks and crossbars: the racks are strictly vertical, the crossbars are horizontal.

Shed roof - design and technology

The roof of a house with an extension consists of two parts, which should be harmoniously combined into one. If the extension is built on the side, the roof will be a continuation of the main one; all that remains is to repeat its design in order to lengthen it. When an attached building is located along its length, its roof is made of a pitched roof. The slope is ensured by the difference in height of the front and rear pillars. The height of the rear ones should ensure that the roof of the extension goes under the main canopy.

The roof is supported by rafters, which we lay on beams. They are made from thick boards, to ensure fixation, we make special grooves. We cut them out on the ground according to a template so that they are all the same. Then after installation in place there will be no need to align horizontally. We treat the grooves with mastic, install them and fasten them to the walls with brackets and metal corners on studs. If the length exceeds 4 m, we install additional vertical supports.

We lay the sheathing on top of the rafters. Depending on the roofing material, we make it continuous or in increments of 0.3–0.6 m. The need for continuous wooden flooring arises when using soft material; we make sparse material for all other types of roofing. We make fastening depending on the type of roof. We fasten corrugated sheets and metal tiles with special self-tapping screws having sealing washers, and ondulin with nails with a wide head. We provide wave overlap. Don't forget about the final design: wind strips not only protect the roof, but also give it a finished look.

Insulation is a mandatory operation for an extension

Mineral wool and polystyrene foam are mainly used to insulate buildings. Mineral wool resists fire and has low thermal conductivity. They are light in weight and have a consumer-friendly release form: rolls, mats. Another popular insulation material is polystyrene foam. Its advantages: it is inexpensive, not afraid of fungus, moisture, rotting. But there are two big drawbacks: rodents love it, and in case of fire it emits toxic gases.

We carry out insulation from the inside in the following sequence:

  1. 1. We install the waterproofing, having previously cut the strips required sizes. We fasten with staples using construction stapler, so as to ensure overlap. We sheathe the frame completely, driving in staples every 10 cm.
  2. 2. Place insulation between the studs. We ensure a tight fit to the wooden structures, close the seams between the individual elements of the insulating material, overlapping the next layer.
  3. 3. We attach the vapor barrier, even if we use polystyrene foam. The fact is that it is necessary to protect not only the insulation, but also the wood. We perform fastening in the same way as waterproofing.
  4. 4. We cover the walls from the inside. We use drywall perfectly flat frame or OSB if there are irregularities. It is tougher and smoothes out imperfections.

What remains is internal and external finishing, where there is room for the owner’s imagination. A frame extension is built quickly, cheaply, lasts for decades, and can be built with virtually no outside help.

Over time, private buildings need to be increased for completely different reasons. For example, an increase in the number of people living, equipping the house with a sewer system, or the desire to protect the front door from direct exposure to cold air. Because of this, there is a need for another room, or expansion of the kitchen area, bathroom, or simply adding a veranda. A frame extension is what you need.

Frame extension to wooden house

To build a frame extension is great solution problems with the need to expand the area. A do-it-yourself extension to a house is usually made of timber, brick, or a combined version. To avoid having to make changes, it is best to initially think through all the features of the structure, because each one needs an individual approach.

Additional living room

If there is a need to add another room, you need to try, because all these actions are tantamount to building a small house.

If you are planning a living room, then it needs to be insulated, heated, and interior and exterior finished

The entire building must be insulated, otherwise the heating provided will be absolutely useless. It is also necessary to carry out waterproofing to avoid problems with dampness and fungus.

Bathroom or kitchen

Before installing the foundation, utilities are brought to the construction site. Sometimes you have to install separate plumbing.

In addition, it is necessary to pay attention to the insulation of absolutely all parts of the building and think through a thorough waterproofing of the floor in advance.

Veranda

A simple structure that is built to protect the front entrance of a building from rain and wind, and is also used in summer time year.

An extension to the house can be in the form of a veranda

It can be closed or open. This building does not require special insulation, but waterproofing is mandatory in any case.

Creating a construction project

In the case when the site has large area, then there will be no problems with the construction of the extension, even if you plan to do all the work yourself. In order not to make a mistake with the required area of ​​the extension, you must make a thorough plan.

First, design the extension in a program or on a piece of paper, calculate the costs

Here are a few basic tips to consider when planning:

  1. Determine exactly the purpose of the extension. It won't necessarily happen living area, it is likely that a person needs a veranda, a garage, or just a separate place like a personal office-workshop. All subsequent nuances of construction work will directly depend on this choice: volume of materials, area, number of openings and much more.
  2. Another circumstance can be called the presence of communications in the designed construction site.
  3. In addition to the number of materials, you also need to know their type. In this way, it will be possible to calculate the cost of future construction and take care of quality, which affects the service life.

Thus, an extension made of timber requires a foundation corresponding to the one under the main structure. If the house was built with his own hands, then the owner of the building knows exactly what the foundation is there. Therefore, doing something like this will not be particularly difficult.

Key details you need to know:

  • foundation size and foundation laying depth;
  • material and the right solution.

As a result, it will be necessary to tie the foundation being built to the existing one. After this stage, walls can be erected. When the owner of the house does not have any information about the foundation, then research is carried out to help choose material and installation. Having poured the foundation, you need to wait about 30 days for it to harden and become strong. Individual attention should be paid to the places where the newly made base is connected to the old one.

Pile foundations can be made even in winter

You can make a pile element; its installation is not connected with those already built.

Construction of extension walls

After the foundation is ready, they begin to arrange the walls - 3 walls, because the 4th is already there, the one to which the room is attached. However, there are also options when 2 walls are enough, it all depends on the design of the building. Adding an extension to a wooden house is usually not difficult at all. Metal plates and other specialized parts are used as fastenings.

Pie wall frame house not much different from the wall of an extension if it is a living room

If additional area made of timber, then you need to take into account that the size of the material should not be less than 200 by 200 millimeters, in the case where it is planned permanent residence. You need to know that timber is a rather heavy material, and subsequently it shrinks. Only upon completion this process you can qualitatively and firmly fix the new building to the house itself.

Regarding the time required for shrinkage, it is about a year, or a little more. The duration of this period is influenced by the area of ​​the extension, the quality of the material, as well as the condition of the structure to which the extension was made. The main rule in this matter is to take your time.

The shield frame is slightly susceptible to shrinkage if the timber used has been dried to the required level

Upon completion of shrinkage, the originally supplied fastening materials are removed and fixed in a new location. During the period of precipitation, the structure should be insulated using felt, cotton wool, or some other material.

News construction work possible all year round, in winter the prices for building materials and work are several times cheaper

To improve the quality of thermal insulation and give good external view joints, a special wooden element is used. At the moment of shrinkage, it may move slightly, so there is a need to remove and strengthen it again.

Don’t forget about the roof of the extension; it can be made a continuation of the roof of the house, flush with the wall or with an overhang - everything is at the discretion of the owner or designer

When the size of the house increases, the issue of roofing arises. Everything happens in the usual way using standard technology. The approximate order of roofing is as follows:

  1. First of all, the rafter system is equipped. Do not forget to comply with all load characteristics.
  2. Upon completion of the installation of the rafters, they proceed to creating the sheathing, using bars and slats. Instead of this design, flooring is sometimes used continuous type- in the role building material Boards or plywood will do.
  3. Facing of gables.
  4. Hemming of cornices.
  5. Installation of wind elements.
  6. Direct installation of the roof. The material is chosen independently, based on the personal taste of the owner of the house.

Next - the floor, ceiling and other interior finishing work. Installing openings is not particularly difficult. If the extension to a wooden house is made of the same material, then other parts are best made using lumber.

Features of the construction of the extension

Let's consider important tips builders who are experienced specialists in this field:

  1. Actions with the tree must be performed during the cold season. When work is carried out at such a time, the weather helps reduce the shrinkage period.
  2. Thermal insulation of a structure made of timber is as efficient as possible inside. This preserves the neat appearance of the building. You can also save a lot on the amount of insulation material.
  3. We should not forget that an extension to a wooden house needs to be coated with an antibacterial agent, which has protective characteristics against the influence of humidity. Fireproofing is a must in this type of construction.
  4. It is best if the number of metal fasteners is kept to a minimum. With all this, it is worth stopping at galvanized ones. This is very important to protect the extension to a wooden house from corrosion.

A frame extension, the construction of which occurs quite quickly, can be erected by anyone.

The extension can be designed in general style facade of the house and will not stand out externally

An extension to a wooden house, if all standards are met, will last a long time, and building it will not be difficult.

Solving the housing problem if you have your own private house is much easier than in a city apartment. The best option is to make an extension that can be used for a variety of purposes:

  • full-fledged living space - additional room;
  • living space with an attic (if the extension is two-story);
  • utility room - its own pantry, which can largely replace a cellar;
  • a spacious terrace or veranda where you can relax with the whole family;
  • garage for cars.

Below we will discuss the basics of technology and step by step instructions creating an extension to a wooden house.

Before choosing a specific building material and technology for constructing an extension, it is important to clearly define the purpose of the room. Perhaps you should immediately plan to create an extension in which it will be possible to live year-round - in case of family expansion or arrival large quantity guests.

Types of extensions

There are several types of extensions to a wooden house. They differ in material, as well as installation features:

  1. frame extensions;
  2. from cylindrical timber;
  3. made of brick;
  4. from cinder block.

Before erecting a structure, it is important to take into account all the nuances that may affect the choice of materials and the specific type of extension:


Do right choice of a specific extension project means correctly correlating the purpose of this structure, the features of the house to which it is attached, with the technology and material of manufacture. To do this, it is important to understand how each type of such structure is built.

Do-it-yourself frame extension: step-by-step instructions and video

A frame extension has a number of advantages:

  • the design is quite simple, and if everything is calculated correctly, it is quite possible to do it yourself;
  • it is erected much faster than brick and cinder block structures;
  • the design is quite light in weight and does not require much effort during operation;
  • In terms of thermal insulation, durability and other consumer qualities, a frame extension to a house is not inferior to others types of structures.

PLEASE NOTE. If you intend to build a two-story extension, you should consider this option - lightweight design and will not create excessive pressure on the ground, so the risks of subsidence are noticeably reduced.

Preparation for construction

On preparatory stage it is important to solve the following problems:

  • What will the frame material be? wooden beams or metal profiles.
  • What type of extension will be connected to the main building?
  • Accurately calculate all dimensions of the structure and develop a detailed drawing.
  • Collect everything necessary materials and tools.

First of all, it is important to decide what type of structure will be built - as a continuation of the house with an increase in the main roof to install a single roof, or as an adjacent building.

It is clear that the second case will be cheaper, simpler and faster - the extension will simply be adjacent to the wall. You can make access from the house directly into it if you make an appropriate hole and install a door.

A diagram of the connection between the structure and the house is presented below.

Structurally, this solution consists of a roof placed on supports. The roof is standardly made of rafters and support boards. For a longer service life, it is advisable to insulate it and lay out a layer of waterproofing. As a rule, it is based on a regular strip foundation.

Interface with the main part of the house occurs at 2 points:

  • wall;
  • roof.

The connection in each of them has its own characteristics, which will be described below. Preliminary sketch of the extension, as well as practical advice things to consider before starting work:

At the same time, for the roof of the extension it is better to choose a material that is elastic enough to make the necessary corrections. You can purchase corrugated sheeting (height within 1 cm) or soft tiles.

In this sense, slate or traditional ceramic tiles and metal tiles are not suitable.

The frame is made of wood or metal. In this case, all parts should consist of only one type of material - then the extension is more reliable and lasts longer.

PLEASE NOTE. Even if the house is in good condition, but quite old, the rate of its subsidence will be several times higher than the subsidence of the extension. Accordingly, it is better not to use a rigid type of connection of the structure to the main wall. In this case, another type of installation is used - “groove-ridge”.

As for tools, no special equipment is required: it is important to have a screwdriver, saw, pliers, building level and other tools for woodworking.

Installation work must be carried out by at least two people - some stages will require joint efforts.

Laying the foundation

The first stage of work is laying the foundation. Since in the vast majority of cases, the construction of a house does not involve the construction of a foundation for an extension, the foundation must not only be laid correctly, but also reliably connected to the main foundation.

PLEASE NOTE. If you are designing the construction of a newly built house, it is better to take into account the extension right away. It can be made after some time, but laying the foundation along with the base of the main building is technically correct option. In this case, the house and the extension will be a single whole, which will ensure their reliability.

The main requirements for the base of the extension are the following:

  • reliability – stable maintenance of the weight of the structure without subsidence: especially important for extensions made of heavy materials or two-story structures;
  • maximum identity with the main foundation in terms of material and laying depth;
  • the most complete adhesion to the main foundation.

Most often, strip foundations are chosen for extensions, since they are quite capable of coping with such loads. However, installation features always depend on the type of soil. You can lay monolithic foundations, made of brick or concrete blocks, and fill them with drainage materials.

Schematic diagrams of the bases are presented in the figure.

The technology for constructing a strip foundation for an extension does not differ from the usual one. In short, a trench is dug, reinforced and filled with concrete.

Connection of the foundation with the main one

This is the most critical stage. which needs to be given special attention. Traditionally, two types of connections are used:

  • "tape-tape";
  • "slab-slab".

According to the “tape-to-tape” type, the stages of work will be as follows:

  1. On the installation side of the extension, a trench is dug corresponding to the depth of the main foundation.
  2. Next, a hole half a meter in diameter is drilled at the base of the house - for the corners of the foundation of the extension. For all other parts, the hole corresponds to the diameter of the reinforcement at a depth of 2/3.
  3. The reinforcement is driven into the foundation of the house; a wooden wedge is used for this.
  4. The foundation of the extension is formed using the driven reinforcement.

Installation according to the “slab-to-slab” scheme is possible in 2 cases:

  • the width of the main foundation allows for appropriate work (from 450 mm);
  • the plate protrudes from the base (at least 300 mm).

Thanks to the extension, it is often possible to solve another important problem - to strengthen old foundation and thereby support the sagging house. Visual videos instructions:

Features of laying the foundation in the case of an old house:

Installation of flooring in an extension

Correctly making the floor in the future room is important from the point of view of 2 factors:

  • thermal insulation;
  • surface evenness.

It is important to make a high-quality floor, especially in cases where the extension to the house will be used as an additional room with the possibility of year-round use.

The strip foundation allows you to install both a concrete floor and make it out of wood. In the case of a columnar base, it is only possible to produce a wooden covering.

Concrete floor

The sequence of technology for laying this floor looks like this:


The concrete surface is quite cold, so this floor needs careful insulation, especially in the northern regions.

Wooden floor

On a columnar or strip foundation, a floor created on the basis of wooden floors. It needs additional treatment to prevent rotting, but wood flooring is much warmer than concrete.

The installation sequence for a wooden floor looks like this:

  1. If an extension to a house is being built as a permanent structure, then preparatory work for laying sand, crushed stone or expanded clay, as in the case of a concrete floor.
  2. A roofing felt substrate is placed on the foundation.
  3. Load-bearing beams are laid on it. If the foundation is columnar, then they are mounted directly on the pillars, the length is adjusted in accordance with the interval. If the foundation is strip, it is important to install intermediate pillars at a certain interval or use long beams if the extension is small in area.
  4. A wooden covering is mounted on the beams.

All wooden parts must be carefully treated with varnish to prevent rotting.

A clear example of installing a wooden floor in a cinder block extension is shown in the video.

Frame installation

The next stage is associated with the direct construction frame structure. To do this, you first need to install the strapping beam. If it is assumed that the wall thickness will be 200 mm, then the dimensions of the end bar will be 25-40 mm, as shown in the detailed diagram.

The end result is a design that looks something like this.

Cutting out the groove in the base can be done completely or incompletely. Can be jointed without cutting using a steel angle.

The lower harness is performed in several stages:

  1. The nest is mounted in the insert.
  2. The overlay is nailed into the base.
  3. The support post is secured with a bracket.

The top trim is formed for reliable installation of the floor beams, as shown in the diagram.

PLEASE NOTE. Interval between vertical supports you need to do a minimum of 50-60 cm, since in this case it will be possible to easily lay insulation materials (mineral wool, polystyrene foam, ecowool, etc.). In addition, there is no practical need for a more frequent arrangement of racks.

The general design of the frame is shown in the diagram.

The construction of walls occurs according to the following algorithm:

  • Installation of a pre-fabricated lower trim on the foundation. The harness is screwed using dowels.
  • A waterproofing layer - foamed polyethylene, roofing felt or other material - must be placed between the piping and the foundations.

  • Vertical beams are nailed to the wall of the house if rigid fastening of two structures is expected. If you just need to build a nearby building, then first make corner posts with temporary fastening.
  • Mounted vertical bars. Their height is selected depending on the number of storeys of the structure, as well as on the method of connection to the main roof of the house.
  • Next, the top trim is mounted.
  • The last stage in installation is making holes for windows and doors.

ADVICE. If it is planned to build a large extension with a large number beams, then it is more convenient to assemble the frame separately, installing all the beams on the lower frame. In this case, there is no need to fasten each element using temporary slopes.

Assembling the roof and connecting it to the main roof

Installation of rafters is carried out in the same way as for a regular roof, however, the need to connect the roof with the roof of the house gives rise to a number of features of this work.

IN general view the finished structure can be schematically depicted as follows.

After erecting the frame, the roof material of the house on the side of the extension must be disassembled so that the rafters appear. It is to them that the connecting rafters of the extension are mounted. Installation is carried out according to the principle of a rigid triangle, while in front acute angle important to put additional beam(shown by arrows in the figure). These elements also serve as an additional measure of protection during snowfalls, which is why they are also called snow supports.

The sequence of actions for installing the roof can be briefly described as follows:

  1. The rafters from the extension are mounted with top harness frame.
  2. The upper end of the rafters is connected to a purlin, which is pre-installed on the roof or attached directly to the roof rafters.

Video installation features

PLEASE NOTE. You should not connect the rafters of the extension to the house in a rigid manner. This can damage the structure due to uneven rates of shrinkage of the main room and the extension. The optimal solution to this problem is the use of a sliding structure that ensures free movement of the lower support.

Finishing and insulation of the roof

At this stage, the roof is completely finished with its sealing and insulation, as shown in the diagram.

PLEASE NOTE. If the roof of the extension simply adjoins the wall of the house, and does not organically connect with its roof, then a sealant is used for insulation, tightly closing the hole between the roof and the wall, as shown in the diagram.

Construction and insulation of walls

One of last stages– construction of walls and their insulation. An extension is a durable structure, and even if it is used only for economic purposes, it is important to create enough good insulation so that temperature changes cannot damage the internal surfaces of the walls and ceiling.

The structure of the wall can be schematically represented as follows.

In fact, this is the final stage of the construction itself. Next, the following work should be done:

  • finishing work inside the extension:
  • exterior cladding of the building;
  • creating a transition to the house;
  • production of windows and doors in the building;
  • carrying out all necessary communications.

All wooden structures it is important to treat with special solutions that prevent rotting and harmful effects temperature changes.

Timber extension

The fundamental stages of constructing an extension (pouring the foundation, constructing walls and installing the roof, followed by insulation and finishing work) do not depend on the choice of a specific construction material. However, depending on it, their own technologies are selected, which differ markedly from each other.

Construction of the foundation

In the case of an extension made of timber (profiled or round), the differences begin already at the stage of laying the foundation. Since the weight of the future extension will be significantly greater than the weight of the frame analogue, accordingly, the base needs to be more reliable.

Often a tiled foundation or a pile foundation is used, less often a strip foundation (for small extensions it is quite suitable). In any case, it must be established for at least 1 year.

From the point of view of simplicity and cost reduction of work, the best option would be to create a pile foundation, which can be built independently of the main foundation of the house.

Video - basic technology for installing a pile foundation

Walling

Building walls is quite simple from a technological point of view. The only drawback of the beam is that it is quite heavy, and at least two people need to work with it.

The fastening materials used are:

metal staples and plates;

  • brackets;
  • steel corners;
  • self-tapping screws, screws, nails.

Technology for laying round timber when building an extension to a house:

Other works

The technology of wall construction, insulation and finishing is not fundamentally different from that described earlier.

In the case of building a structure from timber, two-story structures can be easily made. Of course, in this case, special requirements are placed on the foundation and floors.

Brick extension

Brick extensions to a wooden house are built less frequently. They are great for living, they can also be used as a utility room.

Most often used in such cases monolithic foundation. At the same time brick construction can serve as the basis for the construction of a second similar floor or attic. The installation of floor and roof technology is not fundamentally different from those discussed above.

Cinder block extension

And another cheaper one quick option construction of an extension to a wooden or other house - from cinder blocks (foam blocks, gas blocks are also used). Such a room can serve as an additional room, but is most often used for household purposes.

The construction of a cinder block structure occurs very quickly due to large sizes building material. This option is great if the owners want to make a garage for a car or an ordinary canopy or veranda.