Projects of aerated concrete houses 10 by 10. Construction of a house from aerated concrete. Floors in aerated concrete houses, price

Built country house By frame technology plus a small veranda. The cost turned out to be quite economical, and the time frame was 3 and a half months. We even finished it a couple of weeks earlier than promised. We only go to the dacha in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you very much for building a house made of aerated concrete. The quality of both the material and work is excellent - FRIENDS WILL BE JEALOUS. Time frame for completed work: a house was built from scratch in approximately 4.5 months. Good luck to all of you, good clients And big houses!!


They built our house in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration) , it didn’t turn out cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse together with them! Thank you for such professional guys that you provided us with!


Thank you so much for your work and attitude! Everything is efficient, high quality, fast! Thanks to the team led by Alexey!


The company built a great one for me summer house! I have no complaints about the company, next summer I'm going to build a bathhouse and a garage and I'll definitely contact them. Thanks to everyone, especially Sergei’s team, who built it for me, a lot depends on them!


We built a house from aerated concrete in your company - I’m very pleased. The house was erected on our pre-prepared foundation in 45 days. And as a gift we received home insurance for a year. So I recommend it.


In August 2017 I ordered the foundation ( monolithic slab) for a house in the Leningrad region. In 2018 I already ordered the house itself. I can recommend it because... We were pleased with the result. Everything was done quickly and professionally.


We ordered a house and garage from this company in the summer of 2016. The builders worked for about 4 months, without a break (they really liked it). Everything was done according to the agreement, no extra money was asked.


Frequently asked questions before construction

About the company

How long has your company been in business?

Our company began work as a repair and finishing company in 2007. From that moment on, we have grown into the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

How is the competence of specialists confirmed?

All architects and engineers of the company have qualification certificates. Because the project is not subject to a company license, but to an architect’s certificate. By law, responsibility for the project lies with the architect.

Does your company do all the work? Or do you use contractors?

  • We ourselves carry out general construction, finishing work, site arrangement, wiring engineering systems(electricity, heating around the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Searching, attracting, complying with agreements and monitoring the performance of work by contractors is our task.
  • We carry out 80% of all work on the construction of your home ourselves and only 20% involve contractors.
  • We enter into an agreement with each contractor in which he specifies a guarantee for the work performed by him, and in case of malfunctions, their elimination is the responsibility of the contractor.

Is it possible to see objects that are currently in operation?

Yes, there are objects that we can show at different stages works and already completed houses by prior arrangement.

About the project

Should I buy a standard project or order an individual one?

Buy a ready-made project.

  • Plus is the price.
  • The downside is that it will not include all your wishes regarding materials and layouts. Also, it will require modification to suit the characteristics of your site.

Buy a ready-made project and modify it.

It all depends on the changes you want to make. It is possible that developing an individual project will be more profitable for you than modifying a standard one.

The cost of such modifications must be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all characteristics of the house and site are taken into account.
  • The downside is that the cost of such a project is higher than a standard one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free for you.

How is an individual project developed?

  • The development of an individual project begins with the signing of a contract and the first meeting with the architects, at which the client voices his wishes. Based on the results of the meeting, a design assignment is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move next. Over the entire design period, several meetings take place with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a working draft is developed. This is the calculation phase of each design solution in which the client is not involved.
  • This entire process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when submitting documents for a building permit.

About construction

Will you go to the site where construction is planned?

Yes. When inspecting the site, we take into account the size, access from the road and its width, the proximity of neighboring buildings, the presence of a slope or drop, cardinal directions and what kind of soil is on the site.

Do you help with choosing a site for construction?

Yes. Our specialists help with site selection. They will help you find it according to your requirements on the Internet with advertisements.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, entry conditions, location
  • materials used in construction
  • house architecture features
  • work conditions (working time restrictions)

What guarantees do you provide?

We provide a 3-year guarantee on our work. The manufacturer provides a guarantee for materials and it is different in each case. There are materials for which the manufacturer provides a lifetime warranty.

How can I control construction?

  • We send each client step by step photo work report.
  • We install online video surveillance of the facility 24 hours a day, you and the company’s specialists have access to it (paid service).
  • You can also use the services of companies that provide technical control.
  • The construction is carried out in stages, you always see which stage and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the estimate has been developed and approved.

When should I pay for your work?

For design, an advance payment is required within 5 days after signing the contract in the amount of 70% of total amount. The balance is paid upon delivery to the client finished project.

Payment for construction is divided according to the stages that are specified in the estimate. Each stage of construction is also divided into payments, the size of which may vary (usually due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders near the construction site, it will be suitable garden house, construction trailer, old house or any other building with a roof.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will accommodate our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a power of at least 5 kW and technical water.

If this is not the case, then we will bring our generators FREE OF CHARGE. In most cases, water wood construction used only for household needs, we will provide its delivery on our own.

What time of year do you carry out construction?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save by correctly calculating the estimate and choosing high-quality materials.

Perform quality project documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsk district, Voskresensky district, Dmitrovsky district, Egoryevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomensky district, Krasnogorsk district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Lyubertsy district, Mozhaisky district, Mytishchi district, Naro-Fominsk district, Noginsk district, Odintsovo district, Ozersky district, Orekhovo-Zuevsky district, Pavlovo-Posadsky district, Podolsk district, Pushkinsky district, Ramensky district, Ruza district, Sergiev Posad district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldomsky district, Chekhov district, Shatursky district, Shakhovskoy district, Shchelkovsky district.

Minimum thickness load-bearing wall By building regulations is 250 mm, even if it summer house. Smaller wall thickness is not able to withstand roof loads and influence external factors, such as the wind. For year-round residence in the house, it must be equipped with a heating system, facade insulation and ventilation. For internal partitions Smaller blocks are used, their thickness is 100mm.

Finishing a house made of aerated concrete should be taken seriously. Aerated concrete is a material with increased vapor permeability. Due to temperature differences (indoors and outdoors), condensation forms in it. Therefore for exterior finishing It is worth choosing a material that helps reduce vapor permeability. The most budget option finishing is painting. However, in this case the walls should be close to a perfectly flat state. You can reduce the cost of painting by using inexpensive façade putty. To give her desired color, add water-based color. The most rational finishing option is a ventilated facade using sheet metal finishing materials(block house, siding, etc.). The most expensive - facing brick, it is also the most durable and reliable.

To reduce the cost of construction, you can abandon the full second floor and make an attic. To save budget, it is better to choose a house shape close to a cube, with a minimum number of protrusions and complex shapes, abandon bay windows and balconies. Large quantity windows and a minimum of internal partitions also reduce the cost of building from aerated concrete

Researchers believe that an area of ​​30 square meters per person is the most comfortable option. However, when designing a house, the construction budget is taken into account first of all. The size of the plot also matters, its landscaping is important, as is the comfort inside the house. If the plot is not large, it makes sense to think about the second floor or attic.

To answer this question, you first need to carry out geological surveys. At high level groundwater construction ground floor it will be unreasonably expensive. But if the soil allows, then building a basement will be appropriate when you want to: make a workshop or a room for storing equipment, make a swimming pool or sauna. If the site is on a slope, this basement is formed naturally. During construction, you can equip it and find useful uses for it.

  • -it must be pitched;
  • - the edges should be extended as much as possible so that less moisture gets onto the facade;
  • -it is better to avoid heavy materials ( natural tiles), to reduce the load on load-bearing walls;
  • - tightness must be maintained so that moisture does not seep inside.

When choosing materials, it is better to turn to classic sheet materials. The most budget-friendly, but at the same time reliable and durable - slate (asbestos-cement sheet). However, such a sheet cannot be mounted independently due to its weight and fragility; it periodically requires treatment against fungus. Very practical material is bitumen slate (ondulin). It is easy to install and affordable. Unlike metal tiles, it is silent.

The geology of the site includes checking and studying the soil, this allows you to optimize the cost of the foundation.

What happens if you don't do geology?

If you ignore this stage, then you can choose the wrong foundation and lose from 1,000,000 rubles on alterations.

10 year warranty on foundation, walls, ceilings and roofing.

Ask an engineer a question

What is included in the Engineering Solution?

Documentation on the location and equipment of all technical rooms, electrical points, water supply, ventilation, gas and sewerage.

What is included in a design solution?

Detailed plan and instructions for the foreman, which displays all necessary steps and technologies in the construction of foundations, walls and roofs.

What is included in the architectural solution?

Creation of a sketch and its 3D image, which shows the location and size of rooms, walls, roofing, furniture, windows and doors.

What will you get after this stage?

All technical and visual documentation. Author's supervision of the construction progress. Our architect and designer will visit the site weekly.

Still have questions? Ask them to an engineer.

Ask an engineer a question

What determines the timing?

The timing depends on the chosen project and material (houses made of logs and timber require time to shrink).

What is "house shrinkage"?

This is a natural process of volume change wooden walls and other parts due to drying of the wood.

Who will build my house?

We have our own staff of certified workers and foremen with at least 5 years of specialized experience. A fleet of construction equipment has been put into operation since 2015. We do not involve contractors.

Still have questions? Ask them to an engineer.

Ask an engineer a question

I want it like in this picture. Can you?

Yes! You can send us any image and we will design and build what you want.

Do you have a designer on your staff?

Currently there are 5 interior designers on staff with a total of 74 years of specialized experience.

What is included in an interior design project?

Drawing up a 3D project by a designer, as well as support and implementation of all finishing works.
We will also produce and supply furniture that suits your lifestyle and taste.

Aerated concrete has a cellular structure. For its production, a mixture of lime, cement, quartz sand and water is taken. As a result of the reaction between aluminum powder and lime, hydrogen is formed. This, in turn, creates bubbles that occupy 85% of the block and provide low weight and high strength to the material.

By contacting the SVOD-STROY company, you can order the construction of a house from Aerostone and Bonolit autoclave aerated concrete blocks. They are distinguished by precise geometry and maximum strength. Such cellular blocks do not require the use of tools with carbide tipped and are easy to process, drill, saw, etc.

Turnkey aerated block houses are easy to assemble and are identical in comfort to brick cottages. They are convenient for year-round living in the Moscow region. Their main advantages are the possibility of implementation complex projects, affordable cost and reliability.

Differences between aerated concrete and foam concrete

Foam concrete is made from concrete mixture, diluted with special additives. This mixture can be prepared directly on construction site without any certificate.

In contrast, aerated concrete is manufactured in factories. First as a result chemical reaction a mixture is formed, which is strengthened using an autoclave and cut with special strings. Construction at SVOD-STROY company aerated concrete houses carried out strictly from material manufactured in accordance with GOST requirements.

Advantages of cottages made of aerated concrete blocks

A house made of aerated concrete blocks needs external insulation and shrinkage within 3-6 months. After this, it can be processed in any way and can be absolutely comfortable for year-round use. Block houses belong to the average price segment, but in terms of comfort and durability they are not much inferior to brick structures.

The undeniable advantages of this structure are:

  • profitability - the affordable cost of aerated concrete and its lightness, allowing it to be used simple foundations, reduce the total price finished house from blocks and costs for builders' services;
  • reliability - strong and durable blocks, subject to construction technologies will serve more than one generation of residents;
  • moisture resistance and frost resistance - these characteristics allow you to live in such a house at any time of the year;
  • speed of construction - ease of processing determines the speed of installation.

House projects

The company "SVOD-STROY" provides turnkey construction services for houses made of aerated blocks according to standard and individual projects. Since 1997 we have been leading professional construction private real estate in Moscow and the Moscow region. We offer the most reasonable prices for materials, labor and architects.



Our catalog contains more than 120 original projects with an area from 65 to 520 m2. Any of them can be modified in accordance with individual wishes. Our specialists in Moscow will advise on projects and prices for houses made of aerated blocks, and will also provide guidance on the timing and work plan.

Advantages of a finished 10 by 10 house project

1. The project is easy to build and control the construction. There are no extra protrusions. Simple roof.

2. Construction materials calculated taking into account standard factory dimensions

3. There are already built houses according to this project. See photos below.

4. The square plan saves heat and reduces heating costs.

5. The project was developed according to the size of aerated concrete blocks, so that the blocks had to be cut as little as possible.

6. There is not a single expensive metal beam in the house design.

7. Dimensions of the house are 9.9 x 9.9 meters.

8. Convenient stairs with a landing.

9. Sewer riser in one place.

10. The roof is gable - there are almost no scraps of metal tiles, there are no places that could leak. See roofing costs below.

Characteristics

Layouts of a house 10 by 10:

Ground floor plan:

Second floor plan:

The house will look good either entirely in plaster or in combination with wood. The house will look more attractive with decoration natural materials or as close as possible to those. As roofing material better to prefer composite tiles, since it is less noisy than metal tiles and looks like natural tiles after installation. To finish the base, choose natural stone.

Cost of roofing for house project M142

Just out of curiosity, the roofing for this project was sent to several roofing companies to calculate. They counted on January 19, 2016. Video of the roofing cost for this project.

Roofing made of Monterrey metal tiles, taking into account additional elements on this house: RUB 82,936

Installation of metal tile roofing: RUB 44,625.

Soft roofing Shinglas: RUB 141,721.

Installation soft roof: RUB 100,230

Composite tiles: RUB 222,289.

Questions about the house project

Is it possible to attach a garage to the house?

Yes, it's possible. We have an option for a house with a garage. The exit from the garage to the house can be done under the stairs.

Is it possible to make the second floor not an attic? Raise the roof.

No. WITH gable roof It's better not to do that. Look at options for houses with hipped roofs. .

Is it possible to remove the balcony?

The balcony can be easily removed and a canopy can be made over the terrace.

Project of a house made of aerated blocks, but can it be replaced with another material?

A house can be made from almost any material: large-format ceramic blocks, the so-called warm ceramics, arbolite blocks, cinder blocks, bricks, etc. We will make changes to the project to suit the wall material you need. We do not change only to heat blocks.