The best manufacturers of hewn log cabins. Construction of a wooden house. Log wooden houses and baths, from a log house, hewn and rounded logs. Technology developed over the centuries

Log house from hewn logs

RUB 700 000

I will sell a finished log cabin of a guest house / bathhouse with a veranda and a balcony on the second floor. The log house is made of a thick hewn log of winter harvesting, treated with an antiseptic. The dimensions of the log house in plan (along the centers of the logs) are 8.2 x 5.3. There is a terrace on the 1st floor, a balcony on the 2nd floor. The height of the walls of the 1st floor is 3.0 m, the second floor is 1.5 m, then the chopped gables of the pitched roof. The frame is completely ready for installation.

We found this listing 11 months ago
Click Track and the system will automatically notify you of new offers from all bulletin boards

New complaint
×

Cancel Submit Complaint

The address (Click on the address to view the map) Moscow

More ads

The log cabin is cut down from the winter forest, size 6.3 x 7.1 (size along the axes) is cut into a bowl. height of the 1st floor 2.5m. The height of the 2nd floor is 1.5 m. in the butt about 32 cm. Cocna. Log cabin available. It was cut down in the Kirov region. There are carpenters who can help build a house

Repair and construction

Sakhalin region, Poronaysky urban district, the river Vse

Construction of log houses - The Cost of Construction of a Log House is indicated (see photo) Starting from the foundation and ending with Installation of the roof. - We have been working since 2009 at one place in our exhibition sample in Vidnoe (Moscow region) Berezovaya st. 1. Without days off. And you can also go to our already built facilities built over many years. - We build all over Russia. - And also by going to our store, you will find Bath Houses of any size and type. TO ORDER ANY SIZE AND CONFIGURATIONS! 1. See the ESTIMATE FOR THE CONSTRUCTION OF THIS LOG PRODUCT: Screw piles) - -93 000 r 4. Assembling the log house - 78 000 r. 5. Delivery and unloading - 36,000 rubles. 6. Roof installation and material - 145,000 rubles 7. Ceiling and Floor Beams + logs + installation - 46,000 rubles 8. Total: 718,000 rubles. - the total cost of construction. 9. Payment after the fact, by stages! Possible 1 year installment plan. or lending. 10. Characteristics and equipment of the log house: 11. Total area: 80 sq m2 12. - Height of the log house -2.7 m 13. - Log house "bowl" with a lock 14. - Chopped log / Rounded to Order 15. .- Log diameter 30 cm. Pine. - We provide a full package of accompanying documents for your house - for putting it into operation. - We work with credit programs. Installments for 1 year are also provided. It is also possible to use Math.Capital. - Call, Write WhatsApp or Viber - we will explain everything, discuss projects, advise how best to build your house.

Repair and construction

Russia, Moscow, Central Administrative Okrug, Moscow, Staroe Vagankovo, Mokhovaya street

SPB House 7*8.5 from a log of logs 🎄SPUB🎄CPUB🎄CPUB🎄SPUB🎄CPUB🎄CPUB🎄SPUB🎄CPUB🎄SRUB🎄SRUB🎄SPRUB🎄RUB🎄SPUB🎄CPUB🎄CRub🎄CRub🎄croob🎄 directly from the manufacturer WITHOUT INTERMEDIARIES!!! ❗️Our prices for logs are 10-15% lower than the market ones, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm In the specified price enters: - a domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction

Russia Moscow

CPUB 6*6 from an OCILINED log 220 MM 🎄SPUB🎄SPUB🎄CRub🎄cruub🎄cruub🎄cruub🎄cPub🎄CPUB🎄CPUB🎄CRUB🎄CPUB🎄CPUB🎄CPUB🎄CRUB🎄SPUB🎄CPUB🎄 Log cabins directly from the manufacturer WITHOUT INTERMEDIARIES!!! ❗️Our prices for log cabins are 10-15% lower than the market prices, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm In the specified price enters: - a domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction

Russia, St. Petersburg, Moskovsky district, Moskovskaya Zastava district, Blizhnaya Rogatka

Ready cub at home 8x8. Pubka corner "in the paw" or "in the bowl." Any options. Beranda, mancapda. The roof is broken or gable. The log cabin of a bathhouse can include: - A log cabin of five walls, a log is processed under a planer (the fifth wall is cut in place when installing a log house on the site). - Log diameter from 24 cm. - Bowled corner cutting - Net height (height from floor to ceiling) 2.40 m.. - Internal walls the log house is cut through, or into a "round timber". - Floor joists, ceiling beams. - The roof is gable or broken (optional). - Removal under the veranda (optional) open, without wall lining, 4 support posts and shrinkage compensators included. - Edged board 25 mm for roof lathing. - Finishing floor grooved board 36 mm. In the log house and removal of the 1st floor. - Lining on the ceiling of the log house and removal of 20 mm. (if there is an extension) - Gables - edged board 25mm or lining 20mm. (at the request of the customer). - Mezhventsovy insulation moss or tow (optional). - Ruberoid on the roof. - The foundation is columnar, sand concrete blocks 20x20x40 mm. Sand for filling (about 2 cubic meters) is provided by the customer (the number of blocks depending on the size of the log house). - Bath doors 1.75x0.75 - 2 pcs (without fittings). - Windows 50x50 2-piece (without fittings and glazing). - Fasteners, nails No. 60,80,150,200. - Cement m-500 -1 bag. - The dimensions of the log cabins are indicated internal clean. - Delivery to the customer's site (Moscow region, St. Petersburg and the region, Pskov region, Tver, Yaroslavl, Smolensk, Vladimir, Ryazan, Kaluga, Tula, Bryansk, Kursk, Oryol and other regions - Assembly of a log house of a basic configuration. Price for a log house of the house varies depending on the configuration: - The log house of the house in the minimum configuration - 420000 (felling "in the paw") - The log house of the house in the minimum configuration - 510000 (felling "in the bowl") - The log house in standard equipment- 475000 (cutting "in a paw") - Log house in a standard configuration - 570000 (cutting "in a bowl") - Log house with an attic Gable roof- 515000 (cutting "in the paw") - Log house with an attic broken roof- 525000 (cutting "in the paw") - Log house with an attic Gable roof - 625000 (cutting "in the bowl") - Log house with an attic Sloping roof - 660000 (cutting "in the bowl") - Log house with a removal of 2 m. - 510000 (cutting "in the paw") - Log house with a removal of 2 m. - 590000 (cutting "in the bowl") - Log house with a removal of 2 m and an attic removal of 2 m and an attic Sloped roof - 565000 (felling "in the paw") - Log house with a removal of 2 m and an attic Gable roof - 660000 (cutting "into a bowl") - Log house with a removal of 2 m and an attic Broken roof - 680000 (bowl cut)

Repair and construction

Russia, St. Petersburg, Central district, Palace district, Palace square

Finished log house 8x8. Pubka corner "in the paw" or "in the bowl." Any options. Veranda, mancapda. The roof is broken or gable. The log cabin of a bath can include: - A log cabin of five walls, a log is processed under a planer (the fifth wall is cut in place when installing a log house on the site). - Log diameter from 24 cm. - Corner cutting "into a bowl" - Net height (height from floor to ceiling) 2.40 m. - Floor joists, ceiling beams. - The roof is gable or broken (optional). - Removal under the veranda (optional) open, without wall lining, 4 support posts and shrinkage compensators included. - Edged board 25 mm for roof lathing. - Finishing floor grooved board 36 mm. In the log house and removal of the 1st floor. - Lining on the ceiling of the log house and removal of 20 mm. (if there is an extension) - Gables - edged board 25mm or lining 20mm. (at the request of the customer). - Mezhventsovy insulation moss or tow (optional). - Ruberoid on the roof. - The foundation is columnar, sand concrete blocks 20x20x40 mm. Sand for filling (about 2 cubic meters) is provided by the customer (the number of blocks depending on the size of the log house). - Bath doors 1.75x0.75 - 2 pcs (without fittings). - Windows 50x50 2-piece (without fittings and glazing). - Fasteners, nails No. 60,80,150,200. - Cement m-500 -1 bag. - The dimensions of the log cabins are indicated internal clean. - Delivery to the customer's site (Moscow region, St. Petersburg and the region, Pskov region, Tver, Yaroslavl, Smolensk, Vladimir, Ryazan, Kaluga, Tula, Bryansk, Kursk, Oryol and other regions - Assembly of a log house of a basic configuration. Price for a log house of the house varies depending on the configuration: - The log house of the house in the minimum configuration - 420000 (felling "in the paw") - The log house of the house in the minimum configuration - 510000 (felling "in the bowl") - The log house of the house in the standard configuration - 475000 (felling "in the paw") ") - Log house in the standard configuration - 570000 (cutting "in the bowl") - Log house with an attic Gable roof - 515000 (cutting "in the paw") - Log house with an attic Sloping roof - 525000 (cutting "in the paw") - Log house with a mansard Gable roof - 625000 (cutting "in the bowl") - Log house with an attic Sloping roof - 660000 (cutting "in the bowl") - Log house with a removal of 2 m. - 510000 (cutting "in the paw") - Log house houses with an extension of 2 m. - 590000 (cutting "into a bowl") Log house with an extension of 2 m. and an attic Gable roof - 555000 (cutting "in the paw") Log house with a removal of 2 m and an attic Sloping roof - 565000 (cutting "in the paw") Log house with a removal of 2 m and an attic Gable roof - 660000 (cutting "in the bowl") - Log house with a removal of 2 m. and attic Sloping roof - 680000 (cutting "in the bowl")

Repair and construction

Russia, Moscow, Central Administrative Okrug, Tverskoy District

CPUB 6.8*7.3 from the clipped log 220 mm 🎄SPUB🎄CRub🎄CPUB🎄SRUB🎄SPUB🎄CPUB🎄CPUB🎄SPUB🎄CPUB🎄 RRUB🎄 RRUB🎄SPUB🎄SRUBPHRUB 🎄Crub🎄Crub🎄Crubs directly from the manufacturer WITHOUT INTERMEDIATES!!! ❗️Our prices for logs are 10-15% lower than market prices, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm In the specified price enters: - a domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction


Log house of the guest house-Bani 8.6*6 from the log 🎄SPUB🎄CRub🎄CPUB🎄CPUB🎄CPUB🎄CPUB🎄CPUB🎄CRUB🎄CRUB🎄SPUB🎄CPUB🎄CPOB🎄RUB🎄SRUB🎄SPOB🎄CPUB 🎄Cub🎄 Log cabins directly from the manufacturer WITHOUT INTERMEDIATES!!! ❗️Our prices for logs are 10-15% lower than market prices, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm In the specified price enters: - a domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction

Russia Moscow

Cub Hello! Today in our country there are a lot of companies that compete with each other, trying to seize and buy the market (fraudulently), but we offer you the honesty and openness of our work without intermediaries and deceit. We offer you the following types of work. Basic equipment when selling a log house: · The height of the log house from floor to ceiling in cleanliness is 2.5 m; · Logs of a felling a bowl a warm corner (outside-round timber, inside-round timber); · Floor logs of a felling a step of 800 mm on the centers (a log hewn on the one hand); · Ceiling beams log house step 950 mm in the centers (hewn log on one side); · truss system timber 150 * 50 mm (first grade, edged material); Film (membrane under metal), counter rail; · Lathing first grade 120*25 mm (edged); · The pediments of the log house are sewn up with clapboard 135*20 mm; · Finishing floor 150*50 mm · Moss, nails, staples, antiseptic. one. Civil works when installing a log house: 1.1. Before starting the construction of the log house, the foreman travels to the site for a personal meeting with you (free of charge), assessing the soil, the condition of the access roads and planning the work organization on site. 1.2. The location of the log house is determined (based on your wishes) on your site. 1.3. All construction and installation works are carried out. 1.4. The quality department controls the construction of your house at all stages, from foundation to finishing. 2. Walls and ceilings of the log house. 2.1. The height of the 1st floor is 2.5 m., of the attic floor - 2.6 m. 2.2. load-bearing walls 1st floor - average log size Ø 250-280mm at the top. Planed log of natural moisture with a gasket between the crowns natural insulation jute (moss or tow). The cabin of corners is carried out in a bowl or a paw at the choice of the customer. 2.3. The floor plan is free. 2.4. Bearing columns and retaining beams are made from planed logs. 2.5. The walls and ceiling of the attic floor of the log house, as well as the gables, are mounted on frame technology from lumber 150x50 mm. 3. Ceilings and floors of the log house. 3.1. The overlapping of the 1st floor (logs) is made of lumber 150x100 mm. and 150x50 mm. with a step of 580 mm. or carriage 150 mm. 3.2. Draft floor of a log house from a board of 50 mm. 3.3. REINFORCED ANTISEPTATION of the lower crown and floor log of the 1st floor of the log house, as well as the processing of log grooves. 3.4. Overlapping of the attic floor is made of lumber 150x100 mm. and 150x50 mm. with a step of 580 mm. or carriage 150 mm. Free works that are included under the contract when buying a log house before the end of the month: 1. Preparation of the construction site 2. Departure for measurement 3. Assistance in choosing an object. 4. Assistance in designing 5. Cleaning of construction debris. Add this advertisement to your Favorites to receive notifications about discounts for this project. You can get advice every day in our company! We are waiting for your calls! Best regards, Shamkovstroy company!

Repair and construction

Russia, St. Petersburg, Palace Square

Log house 6.3*9.7 (61.1 m2) from logs 🎄Crub🎄Crub🎄Crub🎄Crub🎄Crubs directly from the manufacturer WITHOUT INTERMEDIARIES!!! ❗️Our prices for logs are 10-15% lower than market prices, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm The specified price includes: - Domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction

Russia, St. Petersburg, Moskovskaya square

Sharb House of Bani 6*6 from iklinded Brevna 🎄CRUB🎄CPB🎄CPB🎄CRub🎄CPUB🎄CPUB🎄CRUB🎄SRUB🎄SPUB🎄CPUB🎄CPUB🎄CRub🎄RUB🎄RUB🎄CRUB🎄CPUB🎄CPUB🎄 Log cabins directly from the manufacturer WITHOUT INTERMEDIATES!!! ❗️Our prices for log cabins are 10-15% lower than market prices, since we have our own production in the Leningrad region. ❗️ Selected Arkhangelsk and Vologda forest. We work under a contract. Warranty 5 years. Staged payment. The site can be found in a search engine by typing the name of our company "Slavburg" construction of log cabins You can get acquainted with all our projects by clicking on the link to Avito-shop. Domokompleks from the rounded log with a diameter from 200 to 300 mm In the specified price enters: - a domokomplekt from a log of 220 mm ready for installation; - The rest of the work and materials are negotiated with the customer individually ❗️ Our company is engaged in: ❗️ - designing; - production of log cabins; - foundations; - subsequent finishing; - engineering. ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ ✅ We will be built by the construction of all types of foundations: ✔️-Swear-screw ✔️-tone ✔️-monolithic railway plate ✅ Support turnkey: ✔️Caulking, painting, grinding ✔️Engineering ✔️Glazing QUALIFIED BUILDERS WITH GREAT EXPERIENCE. OUR PORTFOLIO HAS A LOT OF BUILT HOUSES IN ST. PETERSBURG AND THE LENINGRAD REGION. ❗️- We will arrange for you a visit to our constructed facilities❗ ▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂▂ FREE: - consultations; - departure of a specialist to the site; - cost calculation; - project as a GIFT! ❗️ CALL!!! GET A CALCULATION OF THE COST OF A PROJECT INTERESTING YOU!!! ❗️

Repair and construction

Russia, St. Petersburg, Moskovsky prospect, 103

Buy a log house at home Log house under the planer! Hello! Today in our country there are a lot of companies that compete with each other, trying to seize and buy the market (fraudulently), but we offer you the honesty and openness of our work without intermediaries and deception. We offer you the following types works.! Basic equipment when buying a log house: · The height of the log house from floor to ceiling in cleanliness is 2.5 m; · Logs a bowl a warm corner (outside-round timber, inside-round timber); · Floor logs step 800 mm in the centers (log hewn on one side); · Ceiling beams pitch 950 mm in the centers (hewn log on one side); · Rafter system beam 150*50 mm (first grade, edged material); Film (membrane under metal), counter rail; · Lathing first grade 120*25 mm (edged); · The pediments of the log house are sewn up with clapboard 135*20 mm; · Finishing floor 150*50 mm · Moss, nails, staples, antiseptic. 1. General construction work during the installation of a log house: · 1.1. Before starting the construction of a log house, the foreman travels to the site for a personal meeting with you (free of charge), assessing the soil, the condition of the access roads and planning the work organization on site. · 1.2. The location of the log house is determined (based on your wishes) on your site. · 1.3. All construction and installation works are carried out. · 1.4. The quality department controls the construction of your house at all stages, from foundation to finishing. 2. Walls and ceilings of the log house. · 2.1. The height of the 1st floor is 2.5 m, the height of the attic floor is 2.6 m. · 2.2. Bearing walls of the 1st floor - the average size of the log Ø 250-280mm at the top. Planed log of natural moisture with a gasket between the crowns of natural jute insulation (moss or tow). The cabin of corners is carried out in a bowl or a paw at the choice of the customer. · 2.3. The layout of the log house is free. · 2.4. Bearing columns and retaining beams are made from planed logs. 3. Ceilings and floors of the log house. · 3.1. The overlapping of the 1st floor (logs) is made of lumber 150x100 mm. and 150x50 mm. with a step of 580 mm. or carriage 150 mm. · 3.2. Draft floor of a log house from a board of 50 mm. · 3.3. REINFORCED ANTISEPTATION of the lower crown and floor log of the 1st floor, as well as the processing of log grooves. · 3.4. Overlapping of the attic floor is made of lumber 150x100 mm. and 150x50 mm. with a step of 580 mm. or carriage 150 mm. Free works that are included under the contract when buying a log house until the end of the month: 1. Preparation of the construction site 2. Departure for measurement 3. Assistance in choosing an object. 4. Assistance in designing 5. Cleaning of construction debris. Add this advertisement to your Favorites to receive notifications about discounts for this project. You can get advice and buy a log house at home every day in our company! We are waiting for your calls! Best regards, Shamkovstroy company!

Repair and construction

Russia, Moscow, Voskresenskiye Vorota passage

Construction of log houses - The Cost of Construction of a Log House is indicated (see photo) Starting from the foundation ending with the Installation of the roof. - We have been working since 2009 at one place in our exhibition sample in Vidnoe (Moscow region) Berezovaya st. 1. Without days off. And you can also visit our already built facilities built over many years. - We build all over Russia. - And also by going to our store, you will find Bath Houses of any size and type. TO ORDER ANY SIZE AND CONFIGURATIONS! - Log house of the House 8 mx8m + terrace and balcony 2mx8mx2m in the 2nd floor (see project) = 420,000 rubles - Delivery and unloading of the frame = 40,000 rubles - Foundation (Screw piles) = 88,000 rubles. - Assembling a log house = 83 000 rubles. - Roof installation and turnkey material for metal tiles = 200,000 rubles. - Floor and ceiling logs = 43,000 rubles - Total: 874,000 rubles - the total cost of construction. - -Characteristics and equipment of the log house: - - Total area: 108 sq.m - -Height of the log house 1 floor -3 m and 2 floor -2.7 m - 32cm - Processing with fire protection - Free of charge! - Project of the House (bath) - as a Gift! - We provide a full package of accompanying documents for your house - for putting it into operation. - We work with credit programs. Installments for 1 year are also provided. It is also possible to use Math.Capital. - Call, Write WhatsApp or Viber - we will explain everything, discuss projects, advise how best to build your house.

Repair and construction

Russia, Moscow, Zelenograd, Central Avenue

Construction of log houses - The Cost of Building a Log House is Specified (see photo) Starting from the foundation and ending with Installation of the roof. - We have been working since 2009 at one place in our exhibition sample in Vidnoe (Moscow region) Berezovaya st. 1. No days off. And you can also go to our already built facilities built over many years. - We build all over Russia. - And also by going to our store, you will find Bath Houses of any size and type. TO ORDER ANY SIZE AND CONFIGURATIONS! The cost of building a Log House is indicated (see photo) Starting from the foundation and ending with the Installation of the roof. - Log house of the House 8 mx8m + terrace and balcony 2mx8mx2m in the 2nd floor (see project) = 420,000 rubles - Delivery and unloading of the frame = 40,000 rubles - Foundation (Screw piles) = 88,000 rubles. - Assembling a log house = 83 000 rubles. - Roof installation and turnkey material for metal tiles = 200,000 rubles. - Floor and ceiling logs = 43,000 rubles - Total: 874,000 rubles - the total cost of construction. - -Characteristics and equipment of the log house: - - Total area: 108 sq.m - -Height of the log house 1 floor -3 m and 2 floor -2.7 m - 32cm - Processing with fire protection - Free of charge! - Project of the House (bath) - as a Gift! - All our specialists have Russian citizenship and place of residence! Due to the responsibility and diligence of our compatriots, we achieve good results - Our prices are 30% lower than market prices, since we have own production and we offer a package offer for the services of building your House (bath) that is beneficial for the Customer - We provide a full package of accompanying documents for your house - for putting it into operation. - We work with credit programs. Installments for 1 year are also provided. It is also possible to use Math.Capital. - Call, write WhatsApp or Viber - we will explain everything, discuss projects, advise how best to build your house.

Repair and construction

Russia, Moscow, Slavyansky boulevard

The smell of dry wood, walls that are pleasant to run your hand over, a garden that is beautiful at any time of the year… hewn log in the Kaluga region.

The layout is very simple: hall, living room-kitchen and bedroom with bathroom.

Lunch group. Furniture from "Inlavka" collection "Estate" and "Province".

The wooden house, according to her, is assembled quickly, but it did not work out quickly here: there was not enough money, so the construction was delayed for several years. It took about a year to design and build a log house, another year the house was on the shrinkage. The hostess worked on the interior for only two months.

Almost all the furniture was bought in Inlavka, it was on budget and was in stock. Elena didn't want to wait.


“For me, the most important thing is the atmosphere of this house,” says Elena. - The closer you get to it, the brighter the feeling that you find yourself in a magical place where time stops. It's like opening a grandmother's chest with things dear to the heart!”

The kitchen is combined with the living room and dining room.


The magical atmosphere is created not so much by things as by the walls: the house is built from a single log house, the diameter of the logs reaches thirty centimeters. The smell of dry wood, walls that are pleasant to run your hand over, a garden that is beautiful at any time of the year ... What else is needed for happiness?


The house was built easily, the only difficulty was the small area and limited budget. BUT great advantage- the height of the ceiling, in the ridge it reaches five meters. It gives air to the space and pushes the boundaries.

Wood, which is so rich in our country, continues to be widely used for construction. suburban buildings, ranging from residential buildings and ending with baths and change houses. The markets are different kinds timber for construction wooden houses. This is, first of all, timber, as well as rounded and hewn logs. So what is better for building a wooden house - a beam or a log? Let's try to answer.

hewn log

To obtain this building material, the tree trunk undergoes minimal processing. Only the bark is removed from it, most often manually. Therefore, the resinous layer located under the bark (the so-called sapwood) remains intact. It also protects the wood from rotting and delamination. This is the main advantage of a hewn log, which has a reverse side. Manual processing causes the high cost of this building material.

Recall that the finished hewn log has different diameter along the butt and top of the sawn tree. Therefore, during the construction of a wooden house, logs in crowns should be alternated. That is, in one row of the log house, the top is joined to the butt, and in the next row, the butt to the top. If the log has a natural curvature, then it must be laid so that the bend is at the bottom. Under the weight of the upper logs, the bend will decrease.

rounded log

This type of building timber is produced in the factory. As a result of mechanical processing, a smooth and even log is obtained, which has no deflections and curvature and, most importantly, the same diameter at the top and base. True, for this it is necessary to remove not only the bark, but also part of the sapwood mentioned here. Therefore, this material for the construction of wooden houses, in comparison with hewn logs, is more prone to rotting and warping.

But to assemble a log house without gaps in the crowns and slots from such a log is easier and faster. Yes, and it will look more accurate. Especially if the rounded log is profiled. It has a groove at the bottom and a spike at the top. This will ensure accuracy during the assembly of the log house.

Bar of natural moisture

The low cost of such a bar keeps it popular with consumers for the construction of country wooden houses. The material is produced by sawing a tree trunk into rectangular elements. At the exit of the machine, a bar with a cross section of 100 x 100 mm and up to 200 x 200 mm is obtained.

The main disadvantage of this lumber is considered to be strong natural shrinkage, which gives cracks and distortions in finished building. And the very assembly of a wooden house from a bar of natural moisture requires careful sawing of the locks and fitting the crowns. This work takes a lot of time and is not cheap.

Glued laminated timber

From a technological point of view, this is the most advanced material for the construction of wooden houses. It is produced from lamellas dried in chambers - specially cut boards. Then they are planed and glued under pressure, having previously spliced ​​into a spike. The result is a bar that has the correct geometric shape. At the same time, it is not subject to deformation, warping or shrinkage. The disadvantage of glued beams, in comparison with other lumber, is its high cost.

Profiled timber

The very name of this lumber speaks of a special processing. On the bottom and upper surface of such a beam, special profiles are cut along the entire length - grooves and protrusions. They serve for a bunch of crowns according to the "groove - spike" scheme. At the same time, the log rows are stacked most tightly, providing structural strength and thermal insulation. Yes, the process of assembling a log house is fast. The walls of a wooden house assembled from profiled timber have a smooth and flat surface and do not require further finishing.

So what is better for building a wooden house - a log or a bar? The future owners of suburban real estate should decide.

During the debate that flared up after the publication of the article "Ours in America", a reader who wished to tell about his personal experience. Vyacheslav has been living with his family in a house made of a solid log for four years now. And according to him, if he knew all the "nuances" at the time of choosing the material, he would build a house of brick or blocks. Below in the text - his personal "Top reasons why you should not build a house from a log house." To maintain authenticity, we left the text almost unchanged, making only light stylistic changes.

Why did we want a wooden house?

1. Once we saw with our own eyes a log house - we immediately liked it, it looked very beautiful, we wanted the same one for ourselves.

2. For practical reasons: initially it was assumed that we would come on weekends, heat a solid fuel boiler and quickly warm up the house (the concept changed during the construction process).

3. Environmental friendliness: I wanted the house to breathe easily, smell like a pine forest. Generally liked traditional concept living in a private house wooden frame, grass near the house, forest nearby, etc.

summer house

Start of construction


back view

Here we managed to learn a little from the mistakes of others. My friend, in order to save money, bought the wood himself. As a result, a timber truck came to him, the cutters selected suitable logs, half of the timber truck went back ... As a result, 120 cubic meters wood turned into 200 for him. I worked with contractors who sorted wood at their base, and only what really went into work was brought to the site.


view from the yard

Initially, I did not worry about the construction process, as I trusted the contractors. In the course of the work, they nevertheless “screwed up” in places, but not much (more on that below). The logs were laid on the moss. Chopped and hewn - by hand. After they made a “box” with a roof, the house stood for a year.


from the entrance

Of the interesting things in the construction process, I can note the discrepancy real sizes rooms to their visual perception until the moment the ceilings are covered. I personally measured a 19-meter kitchen with a tape measure, because visually it seemed that there were 7-8 meters. And so - with all the rooms.

Finishing

The most interesting thing began at this stage. First of all, the whole house needs to be sanded from two sides. This work is dreary and not cheap - you can look for prices for work on the Internet, four years ago it cost us a pretty penny (375 sq. M. At $ 5 per 1 sq. M.). Moreover, when estimating the area of ​​work, the bend of the log is added to the formula "height for length" - the area increases.


top plinth - curved fit

Then - impregnation ($ 0.7 per 1 sq.m.). Then - painting in one layer. Then - in the second (both - $ 1 per 1 sq.m.). Moreover, in order for the materials to lay down with high quality, paint the house by hand(which stretches the process in time). After all these procedures, the question of a "breathing house" and "the smell of pine" was removed by itself.
We did not make a basement, so our foundation is simple: PGS pillow, insulation, concrete. The builders pouring the floor did not completely cut out the bottom logs in the doorways. As a result, a year later in these places it “broke” floor tiles(porcelain stoneware). I had to remove the entire damaged tile, cut out the logs, fill the floor with a new one. It turned out to be easier than somehow cutting out the laid tiles - not every tile cutter takes porcelain stoneware.


a crack in the tile remained in the doorway

To the "pleasant" moments of finishing is added regular finishing off the moss stolen by birds, and sealing joints with sealant. This work is long, costly and dreary. Fortunately, there is a sealant manufacturer in Belarus that offers products at reasonable prices. If I had missed the import, I would have gone bankrupt to hell.

Laying communications in a log house also becomes a problem. Plug socket into round log- the same task (and the "tariff" is appropriate). You can't hide pipes inside. Attaching a plinth to an uneven log is also not an easy task, you will have to “think” and work with your hands.


plinth - plank + mastic

Due to the long shrinkage of the house, doors and windows were inserted into the frame of the boards. If you try to bet on a "live log" - the risks of getting "sloppy" increase significantly. Like risk of damage to the door or window. But even this “trick” did not help us personally: for 4 years of operation, the doors were adjusted twice. And some windows still "siphon".

House operation


kitchen box (on the left against the wall)

The house is constantly "breathing". When the heating is on, when it's not, everything moves. To hang the kitchen, it was necessary to build a metal frame, sheathe it with drywall, and only attach the kitchen to it. No other way. It is absolutely impossible to install sliding wardrobes so beloved by our citizens - there is nothing to “attach” to, and the wall and ceiling live their own lives. The ladder, which was “tied” to the wall, ended up warped, the railing was torn out.


instead of wardrobe...

Any decorative boxes that cover communications turn into a work of art - they need to be somehow combine with log wall , and this process turns into a jewelry fit with a construction cutter in hand.

The joints smeared with sealant were greased twice in 4 years. Doesn't matter - cracks appear. Wooden floor on the 2nd floor it also dries out, there are also cracks, and this is inevitable.


crack between logs

By autumn mice enter the house, in the gap between the lower log and the foundation. It is not yet possible to block this road for them, since the interface line is very uneven. And if on the main "animal paths" this phenomenon can be "nullified" with the help of poison and mousetraps, then when mice frolic between logs without coming "to visit" - nothing can be done with them. Damn it.

Also between logs every year wasps make their nests. The issue is resolved with the help of Dichlorvos. But it still has to be decided.

In autumn and early winter on the second floor - the kingdom of flies. First flies get in the cracks for the winter. Then the house becomes warm - and they climb inside. Against this brethren, we have not yet come up with any other means than a vacuum cleaner.

And also we - best friends sellers of Tikkurila paint. There need to tint, here you need to tint: steps, joints, terrace. They did not keep accurate records of production, but a lot of buckets of paint were bought over 4 years.

In spring, when pine blossoms (and then also birch), the whole the house is covered yellow pollen. And - a thick layer. On a flat vertical wall it just wouldn't accumulate that much. This issue is solved by washing the walls with a jet from Karcher. But again, it needs to be addressed.


Bath

Inside the house dust accumulates on the bend of the logs. There are no universal means here - dust can only be removed manually, in the old fashioned way.

Sometimes spontaneous, inexplicable bursts of life happen inside the house - some bugs, midges, insects appear, but I have not installed any system here yet.

In the bath, near the bed for guests, some perky creature lives in a log, crunching on a log all night. It is not possible to find and kill her.

And finally - about the famous "winter" forest. My house was cut down from February. Bath - from the August. Haven't noticed a difference yet.

Issue price

Given all of the above, such housing cannot be called cheap. House with a total area of ​​240 sq. m. (with a small attic floor) cost me $ 40,000 only at the first stage: foundation, box and roof. Then the project expanded, we also built a utility building, a bathhouse from the same "round timber", ennobled the territory, the street next to the house. All this (together with materials, finishes, windows, doors and a geothermal boiler) cost us $ 180,000 in total.


shrinkage to the roof

Conclusion: What we got for these torments is a very beautiful house. And some indescribable pleasure from the feeling of a thick, uneven log, its rough appearance, rich texture ... Friends who began to build across the site from mine listened to approximately the same text, my complaints and advice to build from blocks. And in the end ... they also cut down the log house. Here, of course, everyone decides for himself. But I gave you fair warning.

Interviewed by: Dmitry Malakhov

The main mistakes in the construction of chopped wooden houses.

Chopped houses faithfully serve people for more than one millennium. Houses made of solid wood give their owners the incomparable pleasure of living in a comfortable microenvironment. Solid wood has a high heat capacity (2.4 times higher than that of ceramic brick), which makes it possible to smooth out daily temperature fluctuations. Also, the porous structure of the tree allows you to naturally regulate the humidity in the room due to the cycles of absorption and evaporation of moisture. The frame is relatively resistant to soil and foundation movements. The wooden surface often does not require any additional processing, except for grinding and coating with antiseptics to create beautiful interiors.

However, only correctly cut down trees will give comfort to their owners. wooden houses. The construction of a log house requires high carpentry skills at the level of 6th category. Without experience and qualifications, it is almost impossible to cut down a wooden house without mistakes. And mistakes during construction can negate all the advantages log house. Houses built with mistakes are easy to recognize: builders or owners have to additionally insulate and sheathe them from the outside and inside to hide defects, eliminate through blowing of locks in the corners and interventional seams. One of the modern options for solid wood houses, practically devoid of the disadvantages of log cabins, are glued beam houses. Thanks to the features of this technology, blowing through the seams and cracking wood in such houses is practically impossible.

In this article, we will briefly touch on the most common mistakes in the construction of log houses.

  1. Log preparation errors.

Mistakes in the choice of material for construction.

According to GOST 9463-88 “Softwood round timber”, pine, spruce, fir and larch round timber is suitable for building houses. Larch is the most expensive material, the hardest and most resistant to decay. Spruce has a lower density, excessive knotting and is prone to more cracking. The optimal tree for building a house is a pine aged from 80 to 120 (140) years old, grown in the northern regions (Arkhangelsk, Angarsk, in Karelia) on dry sandy soil, at least 24 meters high. The best pine logs have a dark red or yellow-red core, indicating a high density of wood. More loose varieties have a pale yellow core. The forest of winter felling, contrary to folk legends, actually has a higher moisture content of sapwood (25-50% higher than in summer), large quantity starch and, therefore, more easily affected by fungi. It is possible to determine the round timber of winter felling using a qualitative test for starch: a stroke is applied to the debarked wood with an iodine pencil. If the stroke turns blue - in front of you is a tree cut down in winter.
For construction, it is allowed (this does not mean that you must agree to the purchase of such materials) timber with such defects as mushroom blue and colored sap stains (no more than 1/20 - 1/10 of the end diameter), wormholes (no more than 5-10 pieces per 1 running meter), lateral cracks from shrinkage no more than 1/20 -1/5 of the end diameter, trunk curvature no more than 1-2% (1-2 cm per 1 running meter). Logs used for construction must have a run-off value (thinning of the log to the top) of no more than 0.8 cm per 1 m of length.

Rot (sapwood, rotten, sound) and tobacco knots (decayed knots of brown or white color, crumbling under load) are not allowed in round timber.

The minimum diameter of round timber for a residential building is 22-24 cm. The width of the grooves should be at least half the diameter of the log, and in northern regions can be increased even more. With a smaller size of the grooves, the consumption of timber decreases, but the thickness of the interventional seams becomes smaller, and the house becomes more “cold”.
The cutting of corners can be carried out without residue "in the paw" or with the remainder - "in the corner". Cutting "into a corner" makes the connections more reliable, and the log house more stable. In addition, the wood allowance better protects the castle from the effects of atmospheric factors. The cutting "in the paw" is usually used for the subsequent sheathing of corners or the entire log house. For residential buildings the device for connecting logs in the corners must have internal locking elements that exclude the through blowing of the corner (connecting logs "in a bowl" with a barrier or "in a cloud" with a barrier). Due to its geometry (inverted bowl), cutting "in the cloud" allows better removal of moisture and faster drying of the joint. Cutting internal locking elements requires a highly skilled carpenter, such work takes more time and costs more. Otherwise, the corners of the residential building will be protected from blowing only with tow ( heat-insulating material). This is one of the main disadvantages of round log houses, where log joints are manufactured industrially without additional internal locking elements.

Moisture content of timber for construction. SP 64.13330.2011 "Wooden structures" allows the use of raw solid wood for the construction of houses with a moisture content of up to 40% under the following conditions: the predicted shrinkage of wood should not violate the structure and compliance of the joints, and the timber itself must be subjected to antiseptic treatment and conditions must be provided for them for drying drying and moisture protection. It is optimal if the log house dries out, installed in place on the foundation and under the roof. Drying period from 6 months to 1 year. If the log house stood at the seller in the feet (separate parts of the log house with 5 crowns, convenient in height for processing) without a roof for 6-12 months, then with highly likely this means that the tree will be rotten. It is permissible to purchase log cabins that have stood under the roof.

It is important to understand that the higher the humidity of the timber, the greater the shrinkage of the tree, and the wider the gaps between the crowns, the gaps in the corner joints (especially with cutting defects), the more the tree will crack.

Why don't they cut down houses from dry wood? Dry wood has a greater density and hardness, and is much more difficult to process. The rounded log is subjected to chamber drying upon request after processing. However, the tree chamber drying can be bent in the process of gaining equilibrium humidity at the construction site. They use Finnish and Karelian dry pine of equilibrium moisture in construction, but this is already an exclusive product. In addition, a properly assembled frame made of raw wood, during drying in the assembled state, “sits down” in place, reducing the size of the through slots and, accordingly, the coefficient of blowing through the walls. It is important to know that it is possible to paint (do not mean antiseptic treatment) wood only if its moisture content does not exceed 15%. Otherwise, the wood will crack badly when it dries. Therefore, the processing of log cabins is permissible only with vapor-permeable antiseptics. Treating a damp (damp) log house with a vapor-tight antiseptic will also cause the wood to crack as it dries.

For pins (dowels), only dry (no more than 12%) straight-grained wood without knots should be used. Birch pins must be antiseptic.

Fastening logs to metal elements (reinforcement trimmings, long nails) is not recommended, since moisture accumulates on the media section, and metal elements become centers of biological destruction of wood. Usually, rebar is used by unscrupulous builders to fasten and “tighten” crooked logs, which then leads to a violation of the normal shrinkage of the log house, the formation of cracks and bulging of individual logs. It is strictly forbidden to pierce the corner joints of logs with nails, as this will interfere with the movement of the tree during shrinkage, and will contribute to the formation of cracks (nails after shrinkage of the tree will rise above the surfaces).

Types of timber processing for construction.
The most traditional for Russia is round timber. In Scandinavia, a carriage is used (from the Norwegian "lafteverk" - log cabin) - logs hewn from two opposite sides into two edges, or a semi-carriage - hewn to one edge with inside logs. The cost of a hewn log can be 35-50% higher than a round log. When processing round timber, builders sometimes leave parts of the bast (podkore) not removed. According to the norms, no more than 20% of the bast can remain on the round timber. However, it is better to remove the bast completely by shaving (planing), as the bast contains many polysaccharides, which are an excellent breeding ground for microorganisms and insects that can damage the wood. Also, when guarding, young layers of sapwood that are less resistant to damage by fungi and insects are removed.

2. Errors in the assembly of the log house.

Waterproofing must be laid between the first flashing crown and the foundation. Until now, builders for some reason use for waterproofing short-lived material based on cardboard - roofing material, in which through holes and cracks for 7-10 years. For waterproofing, it is necessary to use modern bitumen-polymer materials with a service life of 25-50 years. Of course, the complete absence of waterproofing is also unacceptable. The use of a backing board under the flashing crown reduces heat losses by heat transfer from the frame to the foundation, reduces the risks of biological destruction of the flashing crown. According to the requirements of SP 64.13330.2011 "Wooden structures", such wooden linings (pillows) should be made of preservative wood, mainly hardwood (oak, aspen). If necessary, backing boards can be replaced with new ones. Replacing the crown crown is a much more time-consuming procedure. lower crowns houses must be protected from moisture. The greatest harm causes splashes of rain reflected from the ground and snow nailed to the wall. To protect the logs from splashes and snow, it is recommended to raise the foundation above the planning mark by at least 40-50 cm.

Additional protection factors for the log house include splash-proof visors protruding above the plinth, long roof overhangs (75-120 cm) and equipping the roofs with gutters and pipes.

Orientation of logs when laying. Every tree has a natural curvature due to wind loads during tree growth. When laying logs, they will certainly be laid with the curvature upwards so that the loads from the overlying structures compensate for the bending of the wood. If you do not follow this principle, then the logs will stick out to the sides. Normally, the deviation of the crowns of chopped walls from the horizontal per 1 m of length should not exceed 3 mm.

The size of the interventional gaps should not exceed 1 mm. With the Russian felling system, it is quite difficult to fulfill this condition, since as the tree dries out, the cracks open up. The advantage is the Norwegian felling system with a wedged longitudinal groove and a sliding self-jamming lock, in which, as the tree dries out, the logs shrink relative to each other, reducing the size of the intervents cracks.

Russia traditionally continues to insulate interventional cracks in log houses natural materials, such as flax, jute, felt, moss, etc., which are not elastic, subject to biological degradation, are a breeding ground for microorganisms and insects. All of these materials require repeated caulking. Meanwhile, in Scandinavia, an elastic self-expanding polyethylene foam tape is used as an interventional sealant, the use of which eliminates the need for repeated caulking.

If possible, you should avoid connecting logs in crowns along the length. Such connections weaken the structure of the log house, and the walls of the log house can be deformed. The logs used in the construction should be as solid as possible. And it is definitely not worth making connections at the intersections of the walls, where load concentrations occur.

Shrinkage and swelling of wood along the fibers are manifested to a greater extent than across the fibers. That's why everything vertical racks and columns must be equipped with shrinkage compensator platforms, which are tightened to the required shrinkage value, which can last up to 6-8 or more years. Perhaps more aesthetic option is the installation of shrinkage compensators at the bottom of the columns, where they are not so noticeable.

It is not recommended to cut openings for windows and doors in the frame before the end of the first active period drying of wood (6-12 months). During the same period, you should not hem the floor, ceiling and sheathe the walls, as this will interfere with normal ventilation and drying of the wood.

Special attention it is worth paying attention to the ventilation of the underground space during the device wooden floors. Minimum area the cross section of one vent should be at least 0.05 m 2, and total area products should be at least 1/400 of the underground area. It should be noted that this design of floors is already archaic. In the world, floors are mainly used on the ground, which allow you to use geothermal, avoid problems with humidity in the underground space and the flow of radioactive soil gases into the house.

3. Mistakes in finishing a log house.

When installing window and doorways we should remember that the minimum distance between the openings is 90 cm. The walls must be reinforced with dowels. For installation in log houses, it is better to use windows and doors with frames at least 10 cm wide, which does not allow window and door block deform during secondary caulking at home.

The fastening of the bars for the frames of doors and windows should be sliding - without the use of nails, since the shrinkage of a wooden house can last quite a long time. Above windows and doors, compensation gaps are left under the top log for shrinkage of 5-8% of the opening height.

It is better to use self-expanding elastic seals for sealing window and door frames. sealing tapes. Plain polyurethane foam May deform when expanded window frames, and when the tree shrinks, form cracks. If it is used, then after hardening it should be covered from the outside from exposure to the sun and moisture with a waterproofing vapor-permeable self-adhesive butyl rubber tape. From the inside, the foam must be covered vapor barrier tape. Unprotected foam quickly breaks down, as in the house in the photo below.

Finishing of interventional seams assembled log after the end of the first stage of intensive drying (12-24 months) with glazing beads or a cord, it is only decorative, contributing to the waste of money and time, but not protecting the walls from blowing. Modern elastic and vapor-permeable interventional sealants (for example, from the domestic manufacturer SAZI) make it possible to protect interventional cracks from blowing through and create an aesthetic appearance walls.

Application of sealant.

External insulation of a wooden house. Most often, external insulation has to be resorted to when construction defects are detected, such as through blowing through walls. The main and most critical mistake is the external insulation of a wooden house with vapor-tight heaters (polystyrene foam, polyethylene foam). In this case, the tree is deprived of the opportunity to dry out, it is moistened, which increases its thermal conductivity and accelerates biological destruction. In clause 8.8 of SP 23-101-2004 "Design of thermal protection of buildings" it is prescribed to arrange the layers of multilayer walls in such a way that the vapor permeability of materials from the inside to the outside of the heated house increases, and does not decrease.

Aesthetics of a wooden house. Often, lovers of wooden houses, where all the elements of the interior, such as walls, floors, ceilings, beams, railings, furniture are made of wood, find that they, perhaps, went a little too far with the number of wooden surfaces that create the feeling of living in a “wooden box”. To the rescue comes the change of furniture and the painting of the walls. However, it is wiser to plan contrasting surfaces in the house at the design stage. These can be floors, ceilings, countertop surfaces in the kitchen, steel elements of stairs and railings, decorative wall from natural or artificial stone.