Report on the commissioning of electrical equipment. Preparation of technical reports on the commissioning work carried out Technical report on the commissioning work of the refinery

An individual heating point cannot be considered operational and ready for use until it has undergone a number of procedures, including electrical installation and commissioning procedures, installation of thermal and mechanical structures. Upon completion of these activities, the ITP is directly put into operation, accompanied by the signing of the following ITP adjustment acts: - intermediate for the thermal mechanical part of the equipment and carrying out hidden measures, as well as for electrical installation and automatic operation, - final for the approval of electrical equipment and heat-consuming installation as a whole. The final one is an act of technical acceptance, which is signed by the receiver and the further owner of this design.

Sample program for commissioning (PNR) etc. and heating systems

The act of acceptance of thermal power plants and heating networks for operation, for organizations that do not have their own staff and service thermal power plants and heating network under contracts (p.


2.1.1 PTE TE). Operational circuit diagrams thermal power plants (pipelines and stop valves) (P.
2.8.3

Attention

PTE TE). Job Descriptions, instructions for labor protection and safety (p.


2.8.4 PTE TE). A set of valid operating instructions.

Important

Availability of technological documentation. Availability technological equipment and a tool for operating a thermal power plant (p.


2.8.1 PTE TE; clause 2.8.6 PTE TE). Approved program for warming up and putting into operation a thermal power plant, heating network.
Programs for testing thermal power plants for strength and density (hydrostatic or manometric leak testing) (p.

ITP commissioning

During the implementation of many projects, capital construction or reconstruction of buildings and structures is carried out with the installation of new equipment or specialized processes.
Such works include the installation of fire extinguishing systems, power supply, air conditioning, ventilation, fire alarm.
All of them require commissioning, for this, in recent times more and more often a program of PNR is being drawn up.
What is commissioning and why they are carried out According to SNiP, commissioning is a set of activities that are performed during the preparation for the implementation of integrated testing and individual testing of installed equipment.

This includes checking, testing and adjusting equipment to achieve design parameters.

Ipc-star.ru

The list of documentation submitted for the admission of heat-consuming power plants and heat networks for operation: A valid permit for admission and an inspection certificate for commissioning or a list of documentation submitted for the admission of heat-consuming power plants and heat networks for commissioning (clause 2.4. 8 PTE TE). Technical reports on the tests (measurements) carried out, including a report on thermal tests heating systems with the determination of the heat-shielding properties of enclosing structures and the heat storage capacity of buildings (clause 2.8.1 PTE TE). List of organizations participating in the production of commissioning works.
The act of comprehensive testing of thermal power plants (clause 2.8.1 PTE TE).

The program of the commissioning

Availability of an expert opinion industrial safety and its approval by the bodies of Rostekhnadzor - when identifying thermal power plants and heating networks as a hazardous production facility (Art.
7, 8 of the Federal Law of July 21, 1997 No. 116-FZ, clause 1.4.

PTE TE). Documents on registration of a heating network with Rostekhnadzor bodies or with an organization that owns a network (Art.

7, 8 of the Federal Law of July 21, 1997 No. 116-FZ, clause 1.4. PTE TE). Passports of pipelines, heating points, ventilation systems and thermal power plants (clause 2.8.1

PTE TE). Certificates for equipment (according to the approved list of products subject to mandatory certification) (sample of the inspection report from the admission procedure)).

The mode of energy consumption established by the energy supply organization (source) (current technical conditions for the connection of thermal power plants) (p.

Methodology for commissioning, etc. sample

Y: 'єvzhvsski Švyѕ-bsh \ -yr2 oadўfshtwyuskd §Hyphyїyfšhyyyiayia ÿyaaeja žfoh • = wu • yoži њ%™ s 7n џ џp џp ]уJ$ЉћСzgКрАјїз;ƒXкёёУцвb,ЖСН7ЭЖ bx0yak, ючЉ#ѓ™œ§ЌФtЧк 1з–fХmEshqdVGDkchotlƒй“ZeObtiHIzh’ FјIshM Њlѕyuu•~jќ`A(зŒŸяйнСДГэю, јюгюю) -„\wBuyaDDЃ–vD%u`$œ5sYuuE Вр h?iСnyжŠ№ œ ЪpoRzDJr wЕX‰YBїY№š]™pog‚'olv™еЂ&РЯš№ЕWЗšpнЯpjTce…knљŽ'_OŒ#ЋC7Ž Y^DyTsbUCVUZZHSHCHFo|їMhOe•U6Œ;™o5lUI5EChE7‡ m»˜‘љцф гNO29§ѓmWMGb™oeMяvG ˜НЦ‡tР@‰g—qЎхE';Ўl+gxkunolX§‚L3pmxZŸGU€’nљ; ‘o j7IE1 Ъ@УQіƒ =УѓХ)