Projects of aerated concrete houses up to 100 sq m

They built a country house using frame technology plus a small veranda. The cost came out quite economically, and in terms of 3 and a half months. Finished even a couple of weeks earlier than promised. We go to the country house only in the summer, so I can’t say anything about thermal insulation. Thank you

Thank you so much for building a house of aerated concrete. The quality of both material and work is excellent - FRIENDS ENVY. The terms of the work performed - in about 4.5 months a house was built from scratch. Good luck to you all, good clients and big houses!!


They built a house for us in 3 months (they started the foundation at the end of summer, and finished the walls and interior decoration in the fall), it turned out not cheap, but everything was thought out, our participation was minimal. This year we are building a bathhouse with them! Thank you for such professional guys that you provided us!


Thank you so much for your hard work and dedication! Everything is prompt, high-quality, fast! Thanks to the team led by Alexei!


The company built a great summer house for me! I have no complaints about the company, next summer I am going to build a bathhouse and a garage, I will definitely contact them. Thanks to everyone, especially Sergey's team, which built for me, a lot depends on them!


We built a house of aerated concrete in your company - very satisfied. A house was built on our pre-prepared foundation in 45 days. And as a gift received home insurance for a year. So I recommend.


In August 2017, I ordered a foundation (monolithic slab) for a house in the Leningrad region. In 2018, I already ordered the house itself. I can recommend, because were satisfied with the result. Everything was done quickly and professionally.


We ordered a house and a garage in this company in the summer of 2016. The builders worked for about 4 months without a break (they liked it very much). Everything was done according to the contract, no extra money was asked.


Frequently asked questions before construction

About company

How long has your company been operating?

Our company began work as a repair and finishing company in 2007. From that moment we have grown to the construction industry and all thanks to our employees. Special thanks for the work invested in the development of the company.

What confirms the competence of specialists?

All architects and engineers of the company have qualification certificates. Because the project is not accompanied by a company license, but by an architect's certificate. By law, the architect is responsible for the project.

Does your company do all the work? Or are you hiring contractors?

  • We ourselves carry out general construction, finishing works, site arrangement, wiring of engineering systems (electricity, heating in the house, water supply) and so on.
  • We invite contractors to work that we do not perform every day and require specialization, for example: the production and installation of windows and doors (special orders), air conditioning systems, boiler room equipment, installation of wells, septic tanks.
  • Search, attraction, compliance with agreements and control over the performance of work by contractors is our task.
  • We carry out 80% of all works on the construction of your house on our own and only 20% involve contractors.
  • We conclude an agreement with each contractor, in which he indicates a guarantee for the work performed by him, and in case of malfunctions, their elimination lies with the contractor.

Can I see the objects that are currently in operation?

Yes, there are objects that we can show at different stages of work and houses that have already been handed over by prior arrangement.

about the project

Buy a standard project or order an individual one?

Buy a finished project.

  • The plus is the price.
  • Minus - it will not provide for all your wishes regarding materials and layouts. Also, it will require refinement for the features of your site.

Buy a finished project and modify it.

It all depends on the changes you want to make. It is possible that it will be more profitable for you to develop an individual project than to modify a typical one.

The cost of such improvements should be discussed at the meeting.

Development of an individual house project.

  • Pros: all your wishes regarding all the characteristics of the house and the site are taken into account.
  • Minus - the cost of such a project is higher than a typical one.

BUT! You can develop an individual project for free. If our company builds, then the development of an individual project is free of charge for you.

How is the development of an individual project?

  • The development of an individual project begins with the signing of the contract and the first meeting with the architects, at which the client voices his wishes. As a result of the meeting, a design task is drawn up, which is an annex to the contract.
  • Architects prepare several versions of sketches and decide with the client in which direction to move on. During the entire design period, there are several meetings with the client, at which all architectural and design solutions are worked out in detail until the client is satisfied with everything, which he confirms with a signature on the Draft Design.
  • Next, a Working Draft is being developed. This is the calculation stage of each design solution, in which the client is not involved.
  • This whole process takes from 2 weeks to 2 months, after which the client receives a finished project with ready-made detailed calculations, which is necessary when applying for a building permit.

About construction

Will you travel to the site where the construction is planned?

Yes. When inspecting the site, we take into account the dimensions, the entrance from the road and its width, the proximity of neighbors' buildings, the presence of a slope or difference, cardinal points and what kind of soil is on the site.

Do you help with the selection of a building site?

Yes. Our experts help with site selection. They will help you find it according to your requirements on the Internet with ads.

What affects the final price of a home?

The cost of building a house is affected by:

  • site features: relief, conditions of entry, location
  • materials used in construction
  • house architecture features
  • conditions for the production of work (limitations on work time)

What guarantees do you give?

We give a guarantee of 3 years for our work. The warranty is given by the manufacturer and it is different in each case. There are materials for which the manufacturer gives a lifetime warranty.

How can I control construction?

  • We send each client a step-by-step photo report of the work.
  • We install online video surveillance of the object 24 hours a day, you and the company's specialists have access to it (paid service).
  • You can also use the services of companies that carry out technical control.
  • The construction is being delivered in stages, you always see which stage, and only after accepting one, we proceed to the next.

When is the contract signed?

  • The design contract is signed at the meeting, before the first communication with the architect.
  • The construction contract is signed after the development and approval of the estimate.

When do I have to pay for your work?

For design, an advance payment must be made within 5 days after signing the contract in the amount of 70% of the total amount. The balance is paid when the finished project is handed over to the client.

Payment for construction is broken down according to the stages that are specified in the estimate. Each stage of construction is also divided into payments, the amount of which may be different (usually this is due to the need to purchase materials)

How are builders placed?

  1. It will be convenient if you have the opportunity to place builders next to the construction site, a garden house, a construction trailer, an old house or any other building with a roof will do.
  2. If there is nothing like that, then we are ready to bring our change house for FREE.
  3. In extreme cases, we will place our builders in a nearby hostel

What communications are needed to start construction: electricity, water?

Electricity with a capacity of at least 5 kW and technical water.

If not, we will bring our generators for FREE. Water in most cases in wooden construction is used only for domestic needs, we will provide its delivery on our own.

What time of year do you build?

We build all year round, one of the important conditions in the spring-autumn period is a suitable road for vehicle access.

WHAT CAN WE DO FOR YOU?

We will help you save money by correctly calculating the estimate and choosing high-quality materials.

Perform high-quality design documentation, thanks to which you can not worry about the design decisions made.

We work throughout the Moscow region

Volokolamsky district, Voskresensky district, Dmitrovsky district, Egorevsky district, Zaraisky district, Istra district, Kashirsky district, Klinsky district, Kolomensky district, Krasnogorsky district, Leninsky district, Lotoshinsky district, Lukhovitsky district, Luberetsky district, Mozhaysky district, Mytishchi district, Naro-Fominsk district, Noginsky district, Odintsovo district, Ozersky district n, Orekhovo-Zuevsky district, Pavlovsky-Posadsky district, Podolsky district, Pushkinsky district, Ramensky district, Ruzsky district, Sergiev Posadsky district, Serebryano-Prudsky district, Serpukhov district, Solnechnogorsk district, Stupinsky district, Taldom district, Chekhov district, Shatursky district, Shakhovskoy district, Schelkovsky district.

Many people are looking for options for building suburban housing with minimal financial costs. The choice in most cases falls on cottages that have a small living area. A family of up to 4 people can comfortably live in such a house. In our catalog you can find interesting and original projects of houses, the area of ​​\u200b\u200bwhich does not exceed 100 square meters. m.

The advantage for users is affordable and low prices. The proposed options are specially adapted for construction within Moscow and the region. The projects include options for buildings up to 100 meters, which are built using cellular concrete. Our specialists offer such options because they are profitable and fully justify the costs.

If you build a house from gas blocks, then the construction will be economical. Such a house will retain heat well, the procedure for laying walls is simplified. Aerated concrete houses up to 100 m2 are similar in their characteristics and environmental friendliness to wooden buildings.

What are the advantages of building a house up to 100 m2?

These projects have begun to be in special demand recently. The following reasons for this popularity can be identified:

  1. Profitability. A person who chooses such a project will be able to save at the design stage, purchase of materials, and installation work.
  2. A wide selection of suburban areas. You can choose any area to start construction.
  3. The building can be used as a guest house or holiday cottage.

These advantages become decisive when choosing a project whose area does not exceed 100 m2.

How to choose and order a project?

Our company offers a wide and varied selection of projects. Each client will be able to appreciate the compactness, thoughtful layout and minimal labor costs. Our catalog offers options for one-story and two-story houses. You can choose a project with a terrace, an attic, a balcony for relaxing in the summer.

We offer our clients the following opportunities for cooperation:

  • at the request of the customer, specialists can change the project according to the wishes;
  • design according to individual parameters.

Our projects of houses and cottages up to 100 sq. m. from an aerated concrete block are specially adapted to the region where the construction will be carried out. Specialists will definitely take into account the type of soil, climatic conditions and terrain characteristics.

The minimum thickness of a bearing wall according to building codes is 250 mm, even if it is a summer house. The smaller wall thickness is not able to withstand the loads of the roof and the influence of external factors such as wind. For year-round living in the house, it must be equipped with a heating system, facade insulation and ventilation. For internal partitions, smaller blocks are used, their thickness is 100mm.

Finishing a house made of aerated concrete should be taken seriously. Aerated concrete material with high vapor permeability. Due to the temperature difference (inside and outside), condensation forms in it. Therefore, for exterior decoration, it is worth choosing a material that helps reduce vapor permeability. The most budget option for finishing is staining. However, the walls in this case should be close to a perfectly flat state. You can reduce the cost of painting by using inexpensive facade putty. To give it the desired color, add a water-based color scheme. The most rational finishing option is a ventilated facade using sheet finishing materials (block house, siding, etc.). The most expensive is facing brick, it is also the most durable and reliable.

To reduce the cost of construction, you can abandon the full-fledged second floor and make an attic. To save the budget, it is better to choose a house shape close to a cube, with a minimum number of protrusions and complex shapes, to abandon bay windows and balconies. A large number of windows and a minimum of internal partitions also reduce the cost of building from aerated concrete.

Researchers believe that an area of ​​30 square meters per person is the most comfortable option. However, when designing a house, first of all, the construction budget is taken into account. The size of the plot also matters, its improvement is important, as is the comfort inside the house. If the site is not large, it makes sense to think about the second floor or attic.

To answer this question, first of all, it is necessary to conduct geological surveys. With a high level of groundwater, the construction of a basement floor will be unreasonably expensive. But if the soil allows, then building a basement will be appropriate when you want: to make a workshop or a room for storing inventory, to make a swimming pool or sauna. If the site is on a slope, such a basement is formed naturally. During construction, it can be equipped and find useful use for it.

  • - it should be pitched;
  • - the edges should be as long as possible so that less moisture gets on the facade;
  • - it is better to abandon heavy materials (natural tiles) in order to reduce the load on the load-bearing walls;
  • - tightness must be observed so that moisture does not seep inside.

When choosing materials, it is better to turn to classic sheet. The most budgetary, but at the same time reliable and durable - slate (asbestos-cement sheet). However, such a sheet cannot be mounted independently due to its weight and fragility; it periodically requires treatment from the fungus. A very practical material is bituminous slate (ondulin). It is easy to install and affordable. Unlike metal tiles, it is silent.

The geology of the site includes checking and studying the soil, this allows you to optimize the cost of the foundation.

What happens if you don't do geology?

If you ignore this stage, then you can choose the wrong foundation and lose from 1,000,000 rubles on alterations.

10 year warranty on foundation, walls, ceilings and roofing.

Ask an engineer a question

What is included in the Engineering Solution?

Documentation on the location and equipment of all technical premises, electrical outlets, water supply, ventilation, gas and sewerage.

What is included in the design solution?

A detailed plan and instructions for the foreman, which display all the necessary stages and technologies in the construction of the foundation, walls and roof.

What is included in the architectural solution?

Creation of a sketch and its 3D image, which displays the location and size of rooms, walls, roofs, furniture, windows and doors.

What will you get after this stage?

All technical and visual documentation. Author's supervision over the course of construction. Our architect and designer will visit the site weekly.

Do you have any questions? Ask them to the engineer.

Ask an engineer a question

What do deadlines depend on?

The terms add up depending on the chosen project and material, (houses made of logs and timber take time to shrink).

What is "house shrinkage"?

This is a natural process of changing the volume of wooden walls and other details due to the drying of the tree.

Who will build my house?

We have our own staff of certified workers and foremen with at least 5 years of specialized work experience. Since 2015, a construction equipment fleet has been put into operation. We do not engage contractors.

Do you have any questions? Ask them to the engineer.

Ask an engineer a question

I want it like this picture. You can?

Yes! You can send us any image and we will design and build what you want.

Do you have a designer on staff?

Now the state employs 5 interior designers with a total profile experience of 74 years.

What is included in an interior design project?

Drawing up a 3D project by a designer, as well as support and implementation of all finishing works.
We will also produce and supply furniture that suits your lifestyle and taste.

    What was done

    Project: the Innsbruck project was adapted to the site and the wishes of the Customer's family, a decision was made to relocate the terrace.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grillage foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - reinforced concrete floor slabs.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order, with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: walls are insulated with basalt facade insulation and plastered, finishing elements are made of wood, made on site, based on TK-visualization, painted. The plinth is lined with decorative stone.
    interior decoration: the decoration was carried out according to the design project, where the combination of decorative plaster with stone and wood was taken as the basis. False beams were mounted on the ceilings.
    additionally: a fireplace is installed and finished.

    What was done

    The very case when our Customer and we speak the same language and are inspired by the ECO high-tech style! Designer Ilya came to us with a ready Project of his future home! Our team liked the project - after all, such unusual and stylish solutions are always a professional challenge!
    We prepared estimates for Ilya and developed unique design solutions - all this allowed us to implement this project! The frame house is made in our proven Canadian technology with 200 mm insulation along the entire contour! Outside, the house is sheathed with imitation timber. All windows are custom-made and laminated in colors according to the project. Additional accents are placed thanks to the professional coloring of imitation timber and the selection of colors.

    What was done

    What does it cost us to build a house? Indeed, having a team of professionals and knowledge - building a house from scratch is a matter of time! But sometimes the task is more difficult! We have introductory - an existing foundation, or buildings on the site, extensions to existing buildings and much more! For the Matsuev family, it was precisely such a difficult task. They had a foundation from an old burnt house, and a landscaped area around it! The new house had to be erected in a short time on the existing foundation. Dmitry and his family had a desire to build a new high-tech house. After careful measurements, a project was made that took into account the old layout, but had a new modern form with interesting innovations! The house has an entrance group where you can sit at a table on cozy evenings and a complex but possible exploitable roof in our lane. To implement such a roof, we called on our knowledge and modern building materials LVL beams, built-up roofing and much more to help. Now in the summer on such a roof you can arrange an unusual dinner or watch the stars at night! In the decoration, our architect also emphasized the minimalist and graphic high-tech style. Smooth stucco walls with painted planken details add personality to the wooden beams at the entrance. Inside, the house is finished with imitation timber, which is painted in different colors depending on the purpose of the room! Large windows in the living room kitchen overlooking the plot - created the desired effect of illumination and airiness of the space! The house of the Matsuev family has graced our photo gallery in the country architecture section in high-tech style, in the style chosen by bold Customers with excellent taste.

    What was done

    Olga and her family have long dreamed of a country house! A reliable, solid home to live in, which will fit perfectly into their difficult narrow lot! With the advent of children, it was decided to realize the dream, children grow up quickly and in their own house in nature there are many opportunities and fresh air. We, in turn, were happy to work on an individual project of a classic red brick house with a bay window! After the first acquaintance with our company in a cozy office, we invited Olga to take a look at our existing construction site: evaluate the order and construction processes, store materials on the site, get acquainted with the construction team, make sure the quality of work. After visiting the facility, Olga decided to work with us! And we were happy to do our favorite work again to make another country dream come true!

    What was done

    Project: changes were made to the San Rafael project and redevelopment was made according to the wishes of the Customer.
    ceilings: basement - reinforced concrete floor slabs; interfloor - reinforced concrete floor slabs
    box: walls made of expanded clay concrete blocks, mortar masonry??? Windows inserted.
    roofing: metal tile
    terrace: rough enclosing elements are made, flooring is done.

    What was done

    Dmitry approached our company with an interesting draft design to calculate the cost. Our experience allows us to perform such calculations according to draft designs with minimal errors, no more than 2%. Having visited our construction sites and received the cost of construction, Dmitry chose us from among many of our colleagues in the shop to complete the project. Our team has embarked on a complex and expressive country project with spacious premises and a garage, large windows and complex architecture. After the project was completed, Dmitry chose us as a contractor, and we, in turn, wanted to do further work at the same high level! Since the object is large, Dmitry proposed a phased cooperation, namely, upon successful completion of the foundation work, we proceeded to the second part of the project - walls + ceilings + roofing. Also, the exact timing of construction was important for Dmitry, in order to speed up the construction processes, the team was reinforced by 2 experienced masons.
    The box on a pile-grillage foundation was handed over right on time! The result pleased us and the Customer. All stages of work were coordinated and worked out for Dmitry and his individual project, from which all participants in the process benefited!

    What was done

    Project: The project of our company Inkerman was changed taking into account the wishes of the Customer's family, the house was planted on the site, taking into account the existing situation on the site and the relief
    foundation: based on geology and the architect's calculations, the house was built on a reinforced pile-grillage foundation.
    ceilings: wooden on wooden beams, in places of large spans installation of LVL beams. The basement is insulated with 200mm basalt insulation; interfloor overlap with sound insulation 150mm.
    box: box: walls made of expanded clay concrete blocks, mortar masonry. Windows inserted.
    roofing: installation of metal tiles.
    exterior finish: the facade is insulated with 100 mm basalt facade slabs, the facades are covered with facing bricks; the color scheme was proposed by the architect and agreed with the customer.

    What was done

    The Krutov family decided to build a spacious house for the whole family!
    From the idea to its implementation, Olga and other family members went through several stages! The choice of technology, the long work on the project, the construction of the foundation, the construction of the house with the exterior and then the work on the interior! The frame technology was chosen as energy-saving, prefabricated and high-tech! Why did the Krutovs choose our company? They liked the quality of work at our construction site and the workers who gave a detailed tour! We also worked on the estimate for a long time, combining different finishes, comparing their cost. This made it possible to choose the best option from a wide variety of finishing materials and configurations.
    The project was created by an architect friend, but we had to work out the constructive part of it. After that, the most reliable and effective foundation was erected - UWB. Then work began on the box. A frame house with 200 mm insulation along the entire contour and a unique 300 mm roof insulation technology. For the exterior, siding was chosen in a spectacular combination of colors - coffee and cream. The accents are placed thanks to the powerful roof overhangs, interfloor belt and large windows!

    What was done

    When you decide to become a happy owner of your own home and move to a new home for permanent residence, first of all you think about what the house will be like; what to build it from; how much will it cost and most importantly, WHO will do all this?
    Alexander came to our company with the desire to move to his own country house. He liked the Avignon project and there was already a strip foundation on the site. After the initial visit to the site, measurements and examination of the foundation, we gave our conclusions and recommendations. Strengthen the foundation, change the project and adapt it to the dimensions of the existing foundation! After agreeing on the cost, it was decided to build in the winter. Alexander received as a gift reinforced concrete floors, one of the leading construction teams and a house according to the project he liked, which stood on the site with exterior decoration by spring! Alexander watched every stage of construction, regularly visiting the construction site and was pleased with the result, and we were satisfied with our work. This is an individually designed Avignon project, implemented in stone technology with external insulation and siding!

    What was done

    Each house is a separate story of creation and implementation! Once we built a house for good people and they recommended us to another good person! Rumyantsev Andrey came to our company with the desire to build a one-story spacious country house with a fireplace for warm family evenings on the site of an old country house ... It was decided to build the house from aerated concrete blocks so that the future country handsome man would please the owner for decades! The customer voiced his wishes for finishing - and we, in turn, brought everything to life. Thanks to the detailed visualization of the project, each element of the exterior decoration is a member of a friendly ensemble! Bavarian masonry, as the final stage of exterior decoration, looks noble and thorough. Without a doubt, such a tandem - aerated concrete and brick can be safely called the best solution in the field of stone housing construction - warm, affordable, beautiful, reliable. Modern technologies have stepped forward so much that such unique configurations become available in a short time, because we built this project during the winter months. The main thing is to have the necessary knowledge and constantly replenish their stock!

    What was done

    Project: the project of a European company was taken as a basis and was adapted to the site and the wishes of the Customer's family, a terrace and a patio were proposed, taking into account the cardinal directions on the Customer's site.
    foundation: based on geology and the architect's calculations, the house was built on a pile-grid foundation.
    ceilings: basement - reinforced concrete monolithic; interfloor - wooden on beams with a sound insulation device of 150 mm.
    box: walls made of aerated concrete blocks, laying with masonry glue. Windows are made to order with one-sided lamination, installation on site.
    roof: metal tile.
    exterior finish: the walls are insulated with basalt facade insulation and plastered. Based on the visualization, facade panels were added under the Tolento stone. The enclosing elements of the terrace, balcony made of wood, made on site, based on the TK-visualization, painted. Roof overhangs are hemmed with spotlights in the color of the roof.

    Vladimir Murashkin,

    The owner of the house "brought to life according to his idea and sketch!"

    House options:

    What was done

    When Customers come to us with bright, modern ideas for a future home, we light up doubly! After all, working on a new stylish project is always interesting and a challenge, how to implement all the bold ideas from a constructive point of view, what materials to use? Vladimir bought a plot with picturesque views of the Oka River! Such a view could not be ignored, so a dizzying terrace (51.1 m2) and a large balcony, focused on beauty, became an indispensable attribute of the future home! Vladimir wanted to relax in nature in a wooden house, and it was necessary to build a house in a short time, and the frame construction technology became an ideal solution for such tasks! If we are different, then in everything! The house was made even more spectacular by the vertical finish with an imitation of durable larch timber, painted in natural shades with an accentuated wood texture. Complement the modern look of the house - windows with lamination! It turned out to be an excellent country house, with zest and at the same time incredibly functional.

    It all started with an individual project found by the Customer's family on a European site. It was with him that she came to our office for the first time. We made preliminary calculations for the project, conducted a tour of the existing construction site, shook hands and the work began to boil! The architect improved and adapted the project to the site and the Customer's family; the foreman "planted" the house on the site. Based on the fact of geological surveys, it was decided to put the house on bored piles. The frame has grown in a few weeks, then the roof, insulation, exterior finish! During the winter, a house grew on the site. The customer invited a third-party technical supervisor who monitored the process regardless of our multi-stage control. The color scheme for painting the imitation of timber was chosen by our manager and here we have a bright and cozy dream country house of the Pushkov family!