The gas meter in the apartment was replaced with a new one. The procedure for replacing the gas meter. Which counter to buy for replacement

Any measuring equipment has an operational period. Replacement of the gas meter must be carried out according to the established rules. Otherwise, his testimony will be considered invalid, and the person will have to pay according to the accepted average rates, and this is quite expensive. Next, we will talk about all the legal nuances.

Gas meter replacement rules

Communication lines of gas supply are objects of increased danger. Installation errors can be fatal. Therefore, various state acts say that only organizations with the appropriate license should be involved in the installation of metering devices. If you violate this rule, you can run into impressive fines, because such actions do not comply with safety regulations.

When installing gas meters in a private house, be sure to follow the following rules:

  1. Before installation, the specialist must make sure that the gas equipment is working and inspect the area.
  2. The minimum distance from the meter to gas appliances is 1 meter.
  3. The minimum distance from the opposite wall is 5 cm (this measure prevents corrosion).
  4. If the meter is installed outside, it must be placed in a metal cabinet or under a canopy.
  5. In the room where the meter will be installed, there must be natural ventilation.
  6. The minimum distance from the floor is 160 cm. Some models may have their own requirements. In this case, they are guided by factory standards (usually indicated in the device passport).
  7. There must be no devices that emit moisture or heat (batteries, sinks, etc.) within 2 meters.
  8. After installation, the device must be sealed by an employee of the housing organization.

The need for replacement is determined by the serviceability of the device or the operational period (written in the passport).

At whose expense

The gas meter is the property of the owner of the house, so he is recognized as responsible for its condition.

According to the order of the State Standard No. 125, the Owner of the house is fully responsible for:

  • maintenance of the counter in proper condition;
  • verification of the device;
  • the correctness of the readings of the device and its performance.

In other words, the property owner is obliged to ensure that the meter is in good condition. If necessary, he must, at his own expense, calibrate and then replace the instrument. This is stated in article 158 of the LCD RF.

The only exception is municipal buildings - in them, replacement work is carried out at the expense of the state, that is, the local administration. On average in the country, the cost of replacing a meter is in the range of 3-4 thousand rubles.

List of required documents for applying

In order to order the installation of a new meter, you must provide the following list of documents:

  • passport of the owner of the house (in its absence, it is permissible to use another document identifying the person);
  • technical passport of the meter;
  • documents confirming the rights to real estate (purchase / sale agreement, house book, etc.);
  • if the applicant rents a house, then a lease agreement is provided;
  • technical plan of the building;
  • application (written drafting in free form is acceptable);
  • approved house gasification project.

Important: the application must indicate all the characteristics of the device (serial number, model, etc.).

After the meter has been replaced, in order to complete the sealing procedure, you will need to provide:

  • technical passport of the new device;
  • certificate of completion of installation work;
  • a document confirming the commissioning of a new meter.

Procedure

Having prepared a list of documents, you must do the following:

  1. Apply to a company that installs gas meters and conclude an agreement with it.
  2. After some time (the period depends on the workload of the company), a specialist will arrive to check the equipment and take the necessary measurements.
  3. After making preliminary calculations, the employee will announce the cost of the work. The service is usually paid immediately (since you need to buy a meter).
  4. Then, on the appointed day, a specialist arrives and replaces the meter. After that, it is necessary to take all the necessary documents from him (the act on the installation work, the contract and the act on putting the device into operation).
  5. After that, you need to contact the management company with an application and the necessary papers for sealing the meter. This procedure is carried out within 3 working days. If the Criminal Code has violated the deadlines, a citizen can file a complaint with the housing inspectorate.

Important! Such procedures should only be carried out by organizations with the appropriate license. Contacting a private specialist is unacceptable.

On the video about choosing a gas meter

Any homeowner is interested in the quality work of a gas meter. If you do not replace a faulty device on time, you will not be able to rely on the readings of the device, and paying according to state standards is expensive.

Like all technical devices, gas equipment has a certain period of operation. To avoid delay, it is better to take measures in advance to replace the gas meter.

The legislative framework

It is forbidden to change the gas meter on your own. The procedure should be carried out by specialists who have the right to carry out work to replace gas equipment.

In the safety requirements or in the instructions for labor protection, the performance of gas hazardous work must be entrusted only to workers with special training and proven qualifications. It is also forbidden to replace the battery yourself by the gas service.

If the nutrient element has sat down, then the master removes the seal, after loading the readings into the database before work. After removing the housing cover, the specialist carefully removes the electronic board with the battery and loads a new one in its place.

If you still decide to replace it yourself, then after the procedure you still need to call the wizard to install a new seal.

Equipment life

The life of the meters depends on the manufacturer, on average from 12 to 20 years. The state has set the service life of the device - 20 years.

The need to replace the device may arise if its service life or verification period has expired. The service life of the device depends on the type and brand of the meter.

Types of gas meters:

  1. Electronic. They are characterized by portable size, high reading accuracy, easy adjustment, noiselessness, easy disassembly when replacing, checking once every 10 years. Suitable for domestic and industrial use. Cons - relatively high cost of $ 35-170.
  2. Membrane. Differ in simple design and high safety. It belongs to the budget option, the cost is $ 20-100. The disadvantages include large size, high noise level, deviations in readings and frequent rechecks.
  3. Volumetric. They are distinguished by reliability, high throughput function, check once every 10 years, acceptable cost of $20-120. Among the shortcomings, an increased noise level and large dimensions are noted. Usually installed in factories and enterprises.
  4. Rotary. They have a low noise level and mobile dimensions, as well as an affordable price of $ 25-105. The disadvantages include frequent errors after long-term operation and checks every 5 years.

Rules and procedure for replacing the device

Who pays for the replacement? Replacing a gas meter in an apartment and apartment buildings is at the expense of the owner of the living space, since it belongs to you. Operating costs must also be paid by the owner.

This decision must be carried out not only by the owners of apartments, but also by private houses. According to Art. 158 of the Housing Code of the Russian Federation, the owner of the house bears all the costs for its maintenance.

If the gas meter is located outside the apartment (for example, in the basement), then all measures to access the device should be carried out by municipal services and completely free of charge, since in this case none of the residents acts as the owner of the device.

The subscriber is responsible for:

  • performance of the gas meter;
  • correctness of indications;
  • verification payment;
  • delivery of the device for verification.

Necessary measures to replace a gas meter in a private house, rules in 2019:

  1. In the territorial management company, you must provide documents and write an application.
  2. It is necessary to order project documentation from the gas supply organization.
  3. Experts evaluate the technical characteristics and supply of gas networks to an apartment or a private house.
  4. The subscriber must independently purchase a gas meter of a certain brand after consultation with a specialized company, as well as pay for the design of its installation.
  5. The owner of the equipment must pay for the dismantling of the old device.
  6. After replacing and checking the gas meter, a certificate of completion should be signed.
  7. Sealing.

When dismantling the old device, the subscriber needs to record the latest indicators and transfer them to the managing organization.

According to Decree of the Government of the Russian Federation No. 354 of 2011 and the Rules for the provision of public services, the period for replacing a gas meter in an apartment and in a private house should not exceed 30 days.

The calculation of the utility bill for this period will be made according to the standard established by the state. After replacing the device from the moment of filing an application for sealing, the managing organization must contact the subscriber within 3 days.

How much does it cost to install

Many subscribers are interested in whether it is necessary to pay for the replacement of a gas meter? The cost of installing a meter is 900-3000 rubles and depends on:

  • type of work and its complexity;
  • brand of the device;
  • meter installation locations (apartment or private house).

The cost of replacing the device must be clarified with the company that produces the installation.. The cost of the work is announced by specialists after studying the technical data of the gas pipeline.

The price depends on:

  • organization's tariffs;
  • region of residence;
  • number of devices;
  • the complexity of the work;
  • the length of the pipe for the output of the device.

You should pay:

  • purchase of a device;
  • the work of the master to remove the device and install the jumper pipe;
  • meter replacement services;
  • verification and repair of equipment.

The cost of replacement varies from 1,000 to 15,000 rubles, depending on the region and city. The average price for the service is 3-7 thousand rubles. If you decide to act on your own, then you will be fined for unauthorized connection of gas.

What documents are needed to replace a gas meter:

  • passport of the owner of the property and its copy;
  • certificate of ownership;
  • passport or certificate for the meter and other gas appliances;
  • a document with data on the last verification;
  • house plan;
  • a project for installing a device in a house listing gas consumption points;
  • agreement on technical VDGO.

The application must indicate:

  • subscriber's passport data;
  • Contact details;
  • address to replace the gas meter;
  • device model type;
  • registration number of the device;
  • the name of the company that installed the meter;
  • date of commencement of use of the equipment;
  • instrument performance before replacement;
  • date of the next verification.

Check or replace?

If the service life of your measuring device is coming to an end, then the verification of the device is also paid by the owner.

Many owners consider this procedure inappropriate because:

  • you have to pay not only for verification, but also for the dismantling and delivery of equipment to the laboratory for verification;
  • the subscriber also pays for the installation and sealing of the device;
  • the verification period lasts up to 3 weeks, gas consumption must be paid according to the standard;
  • if the equipment does not pass verification, then it will have to be replaced, while paying the cost of verification work.

Thus, it is much faster and more profitable to replace the gas meter.

Source: http://zaschita-prav.com/zamena-gazovogo-schetchika/

Rules for replacing a gas meter in 2019

Individual metering devices have a certain service life, so replacing a gas meter is a necessary procedure. The need to install a new device may also arise due to premature failure of the mechanism.

The replacement procedure has clear rules that must be followed. Any violation of the established norms will not allow the commissioning of new equipment, in connection with which the consumer will incur serious costs.

When is a replacement necessary?

The widespread installation of gas meters began from the moment Federal Law No. 261-FZ of November 23, 2009 came into force and should end on January 1, 2019.

Over the past period, gas flow meters have appeared in almost every house or apartment that is subject to existing rules.

Exceptions, starting from 2015, were made only for owners of premises in which resource consumption does not exceed 2 cubic meters per hour.

If there is a metering device, due to a number of factors, it may be necessary to dismantle the old mechanism and install a new one. Reasons for replacing the gas meter:

  1. Expiration of the service life limit. For different models, manufacturers allocate a certain time after which the unit must be written off.
  2. Damage during the warranty period. If the meter fails due to a manufacturing defect or due to improper installation by certified specialists, a replacement with a working device is required.
  3. Failure to pass regular or unscheduled verification. Each IPU gas has a fixed time interval, after the expiration of which it is necessary to confirm the suitability of the device for further operation. An examination may be required due to broken seals, reading errors and damage. If it is impossible to verify that the meter is working, a new one is mounted.
  4. Refusal to pass verification. The cost of the procedure and accompanying actions may exceed the price of a new device. It is more economical to install another meter.
  5. Complete failure, identified by the owner or during inspection. Most manufacturers indicate the period during which the device serves flawlessly. Due to various harmful factors, defects and violations, the operation of the meter may be disrupted earlier than the declared period.

It will be necessary to replace the gas meter if the IPU is considered obsolete. The device often fails certified diagnostics, so the resource company insists on installing a new model.

Attention! Changing the technical condition of the facility, installing additional or more powerful gas equipment, switching to individual heating will lead to an increase in resource consumption. This will make it necessary to change the device to a new one with a higher throughput.

Service life of the gas meter

The period of optimal operation of the mechanism is set by the manufacturer, it must be prescribed in the accompanying technical documentation (passport). Devices are produced with the following parameters:

  • The average service life of standard models varies between 12-16 years. An example is the SGMB 1.6 and KG 4 models.
  • Counters with a maximum period of operation - from 20 years and more. The group includes the brands of devices NPM G1,6, UBSG 001 G4, ETK GSM G4.

The service life of individual gas meters is considered a secondary indicator, the main parameter that you should pay attention to is the calibration interval.

Many manufacturers, along with the main service life, indicate an additional indicator - the average uptime. Usually the parameter is 10 years. Often, consumers mistakenly believe that the meter changes every ten years. In fact, the value is approximate, it allows you to get information about the standard period of operation in the absence of reference conditions.

How to replace a gas meter

A new IPU instead of the old one is installed according to a specific instruction, which must be followed in order to avoid problems with the gas supply organization. Any deviation from the rules can lead not only to financial losses, but also to violate safety standards.

Required documents

The gas meter should only be changed by a representative of a specialized company. There is a number of information that needs to be prepared. To avoid difficulties, it is worth entrusting all work to employees of the gas supply organization.

If third-party certified commercial firms are involved in the replacement, it is imperative to coordinate with the sales company. The representative of the utility service provider must record the readings of the old gas meter, and only then is it allowed to remove the seals.

The first to prepare an application for the dismantling of the IPU, which is accompanied by the following documents (copies):

  • certificates or papers equal to them, which confirm the ownership of an apartment or a private house (land);
  • owner's passport;
  • documents accompanying the new and old flowmeters;
  • technical design of the gas system;
  • service contract (provision of a resource).

It is not always necessary to change the old gas meter: if there are no visible malfunctions of the device, then first it is better to check the IPU, which will confirm or refute the feasibility of replacing the device with a new one

If a replacement is made due to an increase in consumption, a specialist is initially called in to evaluate connectivity. If the new IMP is not equivalent to the old one, changes to the project are required.

Separately, an application is being prepared to the utility service provider on the need to put the meter into operation and seal it. A list of documents is being collected, which is prescribed in Decree of the Government of the Russian Federation No. 824 of September 19, 2013 (supplement to the RF PP No. 354). List:

  1. Data of the consumer of services (owner of the premises): full name, passport, contact information. Basic information of IPU. Be sure to indicate the name of the organization that will do (performed) the installation. Additionally, you need to inform about the estimated installation time.
  2. Technical documentation for a new gas meter.
  3. Contract for the installation of the meter, if the installation was carried out by a third-party company.

On a note! Sealing of the measuring mechanism is carried out free of charge, if the replacement was not caused by violations on the part of the consumer or unauthorized persons.

Procedure

When work is performed by specialists of a gas supply organization, the process occurs according to the following scheme:

If the installation is carried out by commercial specialized firms, the procedure is not much different. The main thing is to notify the gas supply organization about all operations. The owner does not have the right to independently change the gas meter.

Who should pay

The issue of making a payment for the replacement of a gas flow meter is one of the most important. Misinterpretation of the changes in the acts that took place in 2015 caused the appearance of an erroneous idea that payment for work is not required: incompetent information is found on some Internet sites.

In reality, the following conditions apply earlier and in 2019:

  1. According to the law, installing a meter in an apartment or house is the responsibility of the owner. The work is carried out at the expense of the owner.
  2. Persons living in non-privatized housing can count on a free change of the old IPU to a new one.
  3. Reimbursement of part of the costs can be received by beneficiaries. The list of privileged categories of citizens in each region of Russia is different, so you need to find out the exact list in the department of social protection.

There is a misunderstanding, for a fee or for free they make a seal. Most of the time, there is no charge for the service. If the replacement of the device is carried out at the request of the owner or due to deliberate or unintentional violations of operation, the consumer must pay for the sealing. The procedure is inexpensive.

What to do with the old counter

When the flow meter is read and dismantled, it is recommended to store the mechanism until the new IPU is finally registered. Further, the used device can be used for any personal household purposes.

If the meter is operational and not outdated, you can check and use the meter as a substitute for yourself or relatives. The time until the next examination will be calculated regardless of whether the mechanism is installed or not.

Source: https://4schetchika.ru/gaz/zamena-v-chastnom-dome-kvartire/

Replacing a gas meter: rules, deadlines, documents

Like any technical equipment, gas meters have a certain service life. It depends on the type and brand of the device. Replacement measures are best taken in advance to avoid delay. We will tell in the article how the gas meter is replaced, when it is changed and what documents you will need.

The procedure for replacing a gas meter in a private house and in an apartment

It is forbidden to change the gas meter on your own. This is done by gas specialists who have the right to carry out work to replace measuring instruments.

Self-replacement of the counter is fraught with serious consequences. This is dangerous! How to replace a gas meter? The algorithm will be the following.

Step 1. It is necessary to contact the territorial management company that deals with gas networks. You should write an application and provide the required documents.

Step 2 Gas service specialists evaluate the technical characteristics for installing a measuring device in a room. At the same time, attention is also drawn to the supply of gas networks to a private house or apartment.

Step 3. Acquisition of a counter in specialized stores. It is better to entrust this to a specialist who knows exactly which counter to buy.

There are many nuances that an uninformed person may not know. You need to clarify the cost of replacing a gas meter with the company that will perform the installation.

Experts will be able to announce the price for replacing a gas meter after studying the technical data of the gas pipeline in your home.

Step 4 After the gas meter is replaced, everything should be carefully checked. If the owner is satisfied with everything, it is necessary to sign a certificate of completion.

Step 5 The final stage after replacing the gas meter is sealing. Without this procedure, the measuring instrument cannot be put into service.

When dismantling the old gas meter, the owner should record the latest indicators in order to transfer them to the management company in the future.

The gas measuring device is installed in accordance with the established requirements. It can be located at a distance of 80 cm from other gas equipment. The height above the floor must be at least 1.2 m.

What documents are needed when replacing a gas meter?

To apply for a replacement gas meter, the following documents will be required:

  • owner's passport and its copy;
  • a document confirming ownership and a copy;
  • gas meter passport or certificate with a copy;
  • paper with data on the last verification of gas equipment;
  • a project for installing a gas meter in a residential area with a list of gas consumption points.

In the application sent to the management company, for sealing and putting the meter into operation, you must specify:

  • passport details of the owner;
  • contact details for communication;
  • the estimated date of commencement of the use of the meter;
  • registration number of the measuring device;
  • counter model type;
  • the address where the gas meter needs to be replaced;
  • the name of the gas company that installed the device;
  • meter readings before replacement;
  • date of the next verification.

The Decree of the Government of the Russian Federation No. 354 of 05/06/2011 established the Rules for the provision of public services to owners and users of residential premises.

According to this document, the period for replacing a gas meter in a private house and in an apartment cannot exceed 30 days. During this period, the calculation of the utility bill will take place according to the standard established in your region.

After the replacement of the gas meter, from the moment the application for sealing is submitted, the management company must contact the owner within three days. If this does not happen, you have the right to contact the housing inspectorate and file a complaint.

How much does it cost to replace a gas meter?

According to the decree of the government of the Russian Federation, the replacement of a gas meter is carried out at the expense of the homeowner. This is because all the equipment in your home belongs to you. And, therefore, the operating costs fall on your shoulders.

This fact is established not only for owners of private houses. Art. 158 of the Housing Code of the Russian Federation clearly indicates that the owner of an apartment in an apartment building bears all the costs of maintaining the premises.

Thus, you will have to pay:

  • purchase of a gas meter;
  • the work of specialists in removing the gas meter and installing the jumper pipe;
  • the cost of services for verification and repair of the device;
  • services for the direct replacement of the gas meter.

The cost of meter replacement services will be determined by specialists on site. The price depends on the complexity of the work, the number of devices, the length of the pipe for the output of the gas meter, as well as on the region of residence and the tariffs of the organization.

On average, about 15 thousand rubles will have to be paid for the device, and no more than 7 thousand rubles for the services of replacing a gas meter.

All listed expenses are related to the owners of private houses and apartments. If your housing is owned by the municipality, then they must bear all the costs of replacing the gas meter.

Which is better - checking or replacing a gas meter?

If the verification period of your meter is coming to an end, you will also pay for the verification work yourself. Owners consider verification inappropriate for the following reasons:

  • you have to pay not only for the verification itself, but also for the dismantling, installation and sealing of the meter;
  • delivery of the gas meter to the laboratory for verification is carried out by the owner independently and at his own expense;
  • if the measuring device does not pass the verification, it will have to be replaced, but the cost of verification work is paid anyway;
  • the verification period may take up to three weeks - during this time the owner will pay for gas consumption according to the standard.

Therefore, it is believed that at the end of the calibration period it is much more profitable and faster to replace the gas meter. The interval between verifications depends on the brand and type of measuring instrument. It can vary from 5 to 12 years.

Source: https://estatelegal.ru/zhkx/kommunalnye-uslugi/sroki-zameny-gazovogo-schetchika/

Grounds and procedure for replacing a gas meter

Most citizens of the Russian Federation calculate payment for the use of resources based on the readings of gas, electricity and water meters.

Any measuring equipment has its own specific life, after which it must be replaced. In addition, in some cases, when, after the next verification, the device is declared unusable, a new one is also installed to replace it.

The replacement of the gas meter is carried out in accordance with such rules, and is carried out in accordance with the established law.

Grounds for replacement and the need to pay for the operation

According to government decree No. 824 of September 19, 2013, a gas meter can be replaced for the following reasons:

  • After the expiration of the service life (operation) of the device;
  • In the event that the meter has not been verified.

One of the main issues that concern our citizens is whether it is necessary to pay for the verification or replacement of a gas meter. And if the verification of such devices in most cases is practically free, then completely different rules apply to the installation of a new one.

To understand who pays for the installation of a new appliance, you need to pay attention to the type of housing in which it is located:

  • In a private house. In this case, the unequivocal answer to the question, at whose expense the replacement will be made, will be - at the expense of the owner of the property. In the event that the owner of a residential building is an individual or legal entity, the costs are clearly borne by him;
  • In the apartment. If this apartment is privatized, the change of the metering device is carried out for a fee at the expense of its owner. If the premises are municipal, that is, they belong to the state and are provided to a citizen for living, the installation of a gas meter is carried out at the expense of the state.

In addition, for certain categories of citizens, the law establishes a procedure for free replacement. These include:

  • WWII veterans;
  • Large families;
  • Low-income people who have reached retirement age.

Order and cost of replacement

How much does it cost to replace a gas meter? The price for such a procedure will consist of several components:

  • Counter cost. It can vary depending on the type of device and amount to up to 30 thousand rubles;
  • Direct installation procedure. Its value depends on the region (for example, in Moscow it will be about 2500-3000 rubles). In the event that during the replacement process it is necessary to change the gas pipeline system, another 400-5000 rubles will be added, depending on whether gas water heaters and stoves are installed in the house.

What documents are needed to replace the device? Their list is presented as follows:

  • Passport of the owner of the house or apartment;
  • Technical passport of the new device;
  • Documents for the ownership of real estate (state certificate, contract of sale or donation, etc.), house book;
  • Technical plan of the building;
  • Gasification project;
  • Replacement application.

The procedure for taking the necessary steps to change the gas meter is as follows:

  1. Filling out an application and sending it to the gas industry, which is responsible for the territorial area where your house or apartment is located;
  2. Attachment to the application of the necessary documents (property rights, etc.);
  3. A visit by a specialist to your premises and, according to special technical parameters, issuing an opinion on what type of meter can be installed. In addition, the owner is informed of the amount of the replacement service;
  4. Acquisition of the meter itself. A very important point is to buy it in a specialized store. Sometimes, wanting to save money, citizens buy a device from their hands, on the market, but such a procedure is fraught with the possibility of acquiring a faulty meter or with any defects. Particular attention should be paid to the period of its operation indicated in the passport. Since its duration is not considered from the moment the work began, but from the release by the manufacturer;
  5. Installing the meter, signing the act of acceptance of work and making payment;
  6. Putting the device into operation by sealing it.

Source: https://cabinet-lawyer.ru/zhkx/zamena-gazovogo-schetchika.html

Rules for the installation and operation of gas meters

“According to Russian legislation, in the private sector, the installation of gas meters is mandatory, and in apartment buildings - at the discretion of the owner of the apartment. Since 2016, amendments to the federal law "On Energy Saving" have been in force.

When the apartment has only a gas stove, that is, the consumption rate is less than 2 cubic meters per hour, there is no need to set the meter.

In apartments where there is a stove and a gas water heater, that is, the consumption rate is more than 2 cubic meters (you can specify the indicator in the data sheet by adding up the consumption figures of the gas appliances that you have installed), the meter is more profitable for the consumers themselves, ”Krymgazseti explained.

The company added that for the initial installation of a gas meter, you need to take an attorney entered in the Russian register. If the consumer has a Ukrainian-style meter, an attorney and works properly, there is no need to urgently change it. The calibration interval for gas meters is different - from five to ten years. The meter for verification must be handed over after the end of the calibration interval.

If the meter was installed before 2014, but entered into the State Register of the Russian Federation and passed periodic verification, then there is no need to change it. If there is no meter type in the registry, verification must still be carried out according to the verification interval. Such a counter must be replaced before 2020.

The press service emphasized that the dismantling of the meter for verification is carried out by employees of the Krymgazseti State Unitary Enterprise.

To do this, you must submit an application at the place of residence to your gas management department, with which an agreement has been concluded for the supply of gas and the conduct of VDGO. Self-installation of a gas meter is prohibited. Meters installed by non-certified firms are not accepted for operation. To accept the BSG into operation, an application to Krymgazseti and an installation project are required to be included in the executive and technical documentation.

The company recalled that from November 14, prices for the installation, replacement and dismantling of household gas meters were reduced.


Each gas equipment, which includes gas meters, has its own period of operation. Most often, the duration of this period is from 8 to 12 years. Thus, meters installed about 10 years ago have already expired and need to be replaced. But there is an option when replacing the gas meter is not necessary, it is enough to remove and send the old device to the laboratory for verification, where a verdict will be issued on the possibility of its further use. Typically, checking an old meter takes no more than three weeks. And payment for the consumed gas during the inspection period will be charged according to the heated area.

It is necessary to notify in advance the date and time of the replacement of the counter of the one who will perform the services, as well as insist on his mandatory presence during this procedure. The control of the performer is necessary to write off the readings of the removed and installed gas meters, as well as for further sealing the installed device. The presence of the controller during the replacement of the gas meter will also exclude any possibility of disputes regarding the readings of the removed equipment, its serviceability, as well as the integrity of the seals at the time of its removal.
The sealing of a new gas meter is carried out immediately, or no later than 5 working days, the employee performing this service must send his representative to install the seals. Only after that, payment for gas will be made according to the readings of the device.

Technical conditions for installing a gas flow meter The main requirements for the pipe supply and placement of the device can be read in the picture. As a rule, there are no special problems with installation. To perform work on connecting the device itself to the pipe, it will be necessary to submit an application to the subscriber and operational departments of Gorgas with copies and original documents attached:

  1. The passport;
  2. A project for installing a meter in housing, indicating points of gas consumption;
  3. Technical passport for the device, certificate;
  4. Contracts for maintenance and performance of work.

Advice! Ask the maintenance department in advance which meter is better to buy and how quickly it can be sealed after installation.


For domestic purposes, membrane and rotary systems are used. The meter class is selected depending on the amount of gas consumed.

Gas meter replacement, rules and features

After that, it is necessary to take all the necessary documents from him (the act on the installation work, the contract and the act on putting the device into operation).

  • After that, you need to contact the management company with an application and the necessary papers for sealing the meter. This procedure is carried out within 3 working days. If the Criminal Code has violated the deadlines, a citizen can file a complaint with the housing inspectorate.
  • Important! Such procedures should only be carried out by organizations with the appropriate license.
    Contacting a private specialist is unacceptable. On the video about choosing a gas meter Conclusion Timely replacement of measuring instruments is beneficial primarily for the owner himself.

For example, two points of consumption can be connected to a g4 gas meter with a volume of "eaten" gas up to 4 cubic meters per hour. On the g6 gas meter, you can "hang" two consumers with a flow rate of 6 to 10 cubic meters of gas. It will not be superfluous to check the service life of a gas meter, most often it does not exceed 30 years.

Replacing a gas meter After a certain time, every 5-10 years, depending on the model and the requirements of the State Standard, the flow meter must be sent for verification. The essence of this procedure is similar to checking an electric meter or water meter. Issues related to verification are regulated in Law No. 102-FZ.

The obligation to monitor the timely verification of the device, as well as to replace the gas meter in the event of a breakdown, rests with the gas consumer and at his expense. If you do not do this before the end of the calibration interval, this will be revealed and forced to do by the Gorgaz inspector.

Gas meter: installation, replacement, verification

Law on the replacement of gas meters

Law on the replacement of gas meters Replacement of a gas meter in private homes Necessary measures for the replacement of gas equipment:

  1. Project documentation, which can be ordered from a specialized company.
  2. After consultation with the gas supply organization, the owner is obliged to independently purchase a meter of a certain brand, as well as pay for the design of its installation.
  3. Payment for the dismantling of the previous equipment.

How much does the installation cost The cost of installing a gas meter varies between 900-3000 rubles, depending on:

  • the complexity of the work performed;
  • type of work;
  • counter brands;
  • place of its installation (apartment or private house).

And what will happen if the meter is not changed, will gas become more expensive without this device? Read: gas tariffs for the population of the Russian Federation; board with and without meter.

Do I have to pay to replace the meter?

On average in the country, the cost of replacing a meter is in the range of 3-4 thousand rubles. List of required documents for filing an application In order to order the installation of a new meter, you must provide the following list of documents:

  • passport of the owner of the house (in its absence, it is permissible to use another document identifying the person);
  • technical passport of the meter;
  • documents confirming the rights to real estate (purchase / sale agreement, house book, etc.);
  • if the applicant rents a house, then a lease agreement is provided;
  • technical plan of the building;
  • application (written drafting in free form is acceptable);
  • approved house gasification project.

Important: the application must indicate all the characteristics of the device (serial number, model, etc.).

Rules for replacing a gas meter in a private house in 2017

But for a legal replacement, the owner of a broken meter needs to contact a specialist in this field and apply for a replacement (this is usually also free, but with the same nuances as with a free installation). The client pays only the cost of dismantling and equipment, which already makes this process not completely free. Before proceeding with the replacement, it is necessary to complete the plan and fill out the relevant documents.

Attention

In case of debt, pay the debt so that the amount in the account is zero. Before turning on the device, the last readings are recorded on the old counter. Unsealing the old counter and sealing the new one should only be done by the master, who will record these actions in his journal.

Burn with fire

It is not necessary to pay the entire amount at once, you can pay in installments over 5 years as part of monthly gas payments. However, gas supply companies failed to cope with the task. “A significant part of organizations do not have the funds necessary to finance the installation of meters and to provide installments,” the explanatory note to the document says. Another nuance is that in Russia there is simply not the required number of metering devices yet, production cannot cope.
At the moment, 185,000 gas meters have been installed, and more than 800,000 houses are in the queue. “The Russians received additional time to voluntarily make a decision to connect metering devices,” Alexander Kozlov explained.

Gas meter replacement law

The federation is carried out on the basis of the readings of gas, electricity and water meters. Any measuring equipment has its own specific life, after which it must be replaced. In addition, in some cases, when, after the next verification, the device is declared unusable, a new one is also installed to replace it. The replacement of the gas meter is carried out in accordance with such rules, and is carried out in accordance with the established law. Grounds for replacement and the need to pay for the operation According to government decree No. 824 of 09/19/2013, a gas meter can be replaced for the following reasons:

  • After the expiration of the service life (operation) of the device;
  • In the event that the meter has not been verified.

One of the main issues that concern our citizens is whether it is necessary to pay for the verification or replacement of a gas meter.

New gas meter replacement law

  • Free replacement of gas meters: myth or reality
  • Replacing a gas meter: at whose expense
  • Installation of gas meters: the law amends
  • The procedure for replacing a gas meter in a private house
  • Terms for replacing a gas meter and basic rules
  • Grounds and procedure for replacing a gas meter
  • Gas meter replacement
  • Law on the replacement of gas meters
  • Law to replace gas meters free of charge
  • Law on the replacement of gas meters Ukraine
  • Law on the replacement of gas meters

Free replacement of gas meters: myth or reality Important The new federal law has already come, as reported by the State Committee. Based on this amendment and the new draft law, the life of gas consumers is somewhat facilitated exclusively by gas stoves.