Hot water shutdown schedule. Hot water shutdown schedule When will the water be turned off?

Every year in Moscow, as in other Russian cities, hot water supply is turned off. Since hot water is a guarantee of comfort, many people wonder when this will happen in order to adjust their plans to this inconvenience.

When will the water be turned off?

Usually, water is not turned off throughout the city, but gradually in different areas (neighborhoods, sections of several streets, and so on). All water outages occur according to a pre-developed plan, so residents can adjust their plans if desired.

Enter the address of the house to determine the date of shutdown of hot water in Moscow in 2018


Find out the shutdown date

Since MOEK is responsible for maintaining water supply networks, you can view the hot water shutdown schedule in Moscow on the company’s official website. Please note that in rare cases there may be slight deviations from the schedule if the planned work is not completed on time. To view the hot water shutdown schedule for 2018 at your home address, follow the link.

How long does a shutdown usually last?

The lack of hot water causes a lot of inconvenience to modern people, so for many people the question of the duration of a water outage is very relevant. Usually hot water is turned off for a period of 10 days. If hot water supply has not been restored within 2 weeks, you have the right to demand a revision of utility bills.

Often the water is turned off for just a few days. Refers to new areas where new pipes and other equipment used to provide hot water and heat to apartments have been installed. Checking the operability of the networks and their readiness for the heating season in this case takes 3-4 days, although it may vary depending on the characteristics of the system and the area. As the number of new pipes and equipment increases each year, water shutoff times for many areas are reduced. But about 70% of communication networks in the capital remain from Soviet times.

Why is the water turned off?

An annual shutdown of hot water is necessary to check the serviceability of the networks and their readiness for the next season. Hot water supply is stopped for preventive maintenance. They necessarily include high-pressure hydrotesting, which makes it possible to identify weak points in the pipelines. Eliminating faults and weak points reduces the risk of emergency situations during the cold season.

Not only heating networks, but also heat exchangers, pumping and other equipment require regular maintenance. During the period when hot water is turned off, maintenance and various preventive works are carried out, which help prevent many troubles during the heating season.

Already on September 1, some residents of Khabarovsk will be left without hot water - the autumn pressure testing of heating networks begins in the Far Eastern capital. Power engineers will have to test the strength of more than 200 kilometers of heating mains before the heating season.

WHEN AND WHERE WILL THE HOT WATER BE TURNED OFF?

Consumers of the Industrial District and partly of the Central District will be the first to be left without water - within the boundaries of Mukhina Streets (from Postyshev to Slobodskaya), Gamarnika (odd side), Slobodskaya, Pushkin Street (to Karl Marx Street)

The outages will also affect some residents of the Zheleznodorozhny district - the Khabarovsk-2 district, Aerodromnaya, Tselinnaya, Kostromskaya streets, the area of ​​Geodesicheskaya, Promyvochnaya, Shmakovskaya streets, and Dosy.

At this time, two suburban villages in the Khabarovsk region - Ilyinka and Rakitnoye - will also be in the shutdown zone.

From 6 to 12 September Hot water will be turned off in houses in the Podgaev Street area due to the repair of a boiler room in the Volochaevsky town.

From September 18 to 28 - Krasnoflotsky, partially Kirovsky, Central and Zheleznodorozhny district

Following CHPP-1, hydraulic tests will begin at CHPP-3. All residents of the Krasnoflotsky district will remain without water for ten days, as well as some consumers in the Central district of Khabarovsk: within the boundaries of Ussuriysky Boulevard, Leningradskaya, Amursky Boulevard and Sheronova streets. In the Kirovsky district, hot water will disappear on Amursky Boulevard, Dzhambula, Shelesta, Voronezhskaya, Leningradskaya and Mukhina (from Postyshev to Leningradskaya). In the Zheleznodorozhny district, everyone will be left without water except for the residents of Aerodromnaya, Tselinnaya, Geodesicheskaya, Promyvochnaya, Shmakovskaya, Kostromskaya, DOSov and the Khabarovsk-2 district - these consumers will be provided with water by CHPP-1.

The last one on schedule is CHPP-2. During the pipeline testing period, residents of the Kirovsky district within the boundaries of the streets: Amursky Boulevard, Dzhambula, Metallistov, Tikhovenaya, Istomina will remain without hot water.

Also, consumers in the Central District will not have water within the boundaries of the streets: Amursky Boulevard, Sheronova, Lenin - from Blucher Square to the street. Shevchenko.

Strength testing of heating networks is carried out to determine their readiness for the next heating season, explains Director of KhTSK Sergei Nehoroshikh.- The pressure in the pipelines is increased to a level approximately a quarter higher than the standard load. This is necessary in order to promptly identify “weak spots” in heating networks and prevent the formation of defects and failures in heat supply during the upcoming heating season. Therefore, we ask consumers to be understanding of the inconveniences associated with the temporary lack of hot water.

Every summer, Muscovites are faced with one, but very unpleasant situation - turning off the hot water in the house. Despite the fact that in anticipation of this event, a warning about the schedule for turning off hot water in the house is posted on the information board at the entrance, it is impossible to prepare mentally for this. The current year 2017 was no exception. Some have already survived the time of basins and pots, while others are yet to do so. Our new article is dedicated to them and all those who wish to familiarize themselves with the hot water shutdown schedule in Moscow in 2017. We will tell you why it is turned off every year, why there are houses where this does not happen, how and on which official website to look at the schedule for turning off hot water in your home this summer.

When the hot water is turned off in our house, the first thing that comes to mind is why? Who needs this anyway? They are mocking us, we live in the 21st century and are running around the apartment with pots and basins! But let's not forget. According to weather observation statistics since 2006, in Moscow, out of 12 months of the year, the temperature is less than 10 degrees in 7 months.

In this regard, shutting off hot water is required by utility services to check the communications of the house and prepare them for the next heating season. During this period, all elements of the city heat supply are tested, which include thermal stations, central and individual heating points, as well as distribution and main heating networks. Unfortunately, it is impossible to carry out high-quality diagnostics and necessary repairs of all technical units without turning off the hot water in homes.

For how many days is hot water turned off in Moscow?

In 2017, hot water in Moscow was turned off for 10 days. You will be pleasantly surprised that just a few years ago, for example, in 2011, this period was 14 days. Once upon a time, hot water was turned off for 21 days!

It should be noted that in different neighborhoods and even houses the condition of thermal communications is different - less wear and tear and more technically accessible diagnostics. In this case, the time spent on checking all heating lines is lower, which means the 10-day period for turning off hot water will be reduced.

I know peoplewhose hot water is not turned off in the summer?

We all know the lucky ones whose hot water is not turned off in the summer, and in this difficult time we envy them. The question of why hot water is turned off in some houses and not in others also worries many Muscovites. The answer is simple. It is extremely rare that water is turned off in houses with an alternative pipeline or with new generation heating networks.

If the house has an alternative pipeline, then it is used to supply hot water to the apartments while checking the main one. As for modern heating networks, their diagnostics are generally possible remotely via a computer. As a rule, an alternative pipeline and, especially, a new generation of heating networks are installed in new houses, and not for which, including for this reason, they were launched in 2017.

Has your home already had hot water turned off this summer?

Poll Options are limited because JavaScript is disabled in your browser.

Hot water shutdown schedule in 2017

If you do not yet know when hot water will be turned off in your home, you can find out on the official website of the Moscow Mayor in the public services section. To check the hot water shutdown schedule, just enter the street and your house number in the interactive field. Let's check how it works!


State service – Check the hot water shutdown schedule at the address on the Moscow Mayor’s website mos.ru

For example, on Metallurgov Street, building 17, hot water was turned off this year from June 26 to July 5, and on Petrovka Street, building 20/1 - this happy event will happen from July 27 to August 5. The luckiest of all were the residents of the house at Novopeschanaya Street, building 8, building 1. In their house, hot water will not be turned off in the summer of 2017.


Hot water shutdown schedule at address - Example No. 1
Hot water shutdown schedule at address - Example No. 2
Hot water shutdown schedule at address - Example No. 3

You can check the hot water shutdown schedule in your home, as we did, by following the link - https://www.mos.ru/otvet-dom-i-dvor/grafik-otklucheniya-goryachei-vodi/?utm_medium=ek.

Time for repairs has expired, but they didn’t give me hot water!

This situation also happens often. In this case, we have the right to report this to three authorities at once. The first thing you can do is write an email to the Moscow Housing Inspectorate. The electronic reception of this service is available at the link - http://mgi.mos.ru/feedback/reception.


Infographic “What to do if the hot water is turned off at home?”


Infographic “What to do if the hot water is turned off at home?”

Social media review “Hot water outage: how do people survive?”

The period and timing during which hot water supply will be stopped due to planned work has become known. The hot water shutdown schedule is somewhat different for Moscow and the region. The work period will be 10 days, but for some areas it will be reduced to three.

Disabling DHW in Moscow

The period of termination of hot water supply will begin in May of this year. It will be completed by September. The planned shutdown of hot water will take place in Moscow from May 13, 2019 to September 1. The same period is relevant for New Moscow. The termination period for hot water supply will not exceed ten days. For some areas it will be limited to 3 days. In some homes, water shutoffs are not expected at all.

The schedule for turning off hot water at the address can be clarified in the form at the beginning of the article, on the official website of the Moscow United Energy Company OJSC. Or call the toll-free hotline, which is available to citizens 24 hours a day.

Notification must occur no later than 10 days before the start of work. The information will be constantly updated. Therefore, for individual areas and streets it must be clarified during the period of preventive work.

In the form or on the MOEK website, hot water shutdowns can be specified for individual administrative districts of the capital and microdistricts.

Hot water shutdown by area

In order to clarify the start date and termination date of hot water supply for each individual district and microdistrict, you must select the administrative district from the drop-down list: North-East Administrative District, North-Western Administrative District, Eastern Administrative District, Western Administrative District, Central Administrative District, South-Eastern Administrative District, South-Western Administrative District, Northern Administrative District, Southern Administrative District. Then determine the street and house number.

In the case where the schedule is not determined, this means that the object of interest is owned by another organization and the work schedule must be clarified directly with the Management Company.

The schedule is presented in full days. That is, the start from 00 hours 00 minutes of the specified date, the planned completion of work at 23 hours 59 minutes of the day indicated in the schedule.

Turning off hot water in the Southern Administrative District

At the beginning of May of this year, it will be possible to familiarize yourself with the interactive list of addresses for termination of hot water supply and the work schedule.

The list will include 16 districts. Including Biryulyovo, Chertanovo, Tsaritsyno, Orekhovo-Borisovo and others.

Turning off hot water in North-Eastern Administrative District

Termination of hot water supply in the North-Eastern Administrative District of the capital will also be presented in the form of an interactive list. Data on the schedule and timing of the work will be published by MOEK in early May of this year.

The list will include 15 districts. Among them will be Sviblovo, Maryina Roshcha, Otradnoe, Bibirevo, Rostokino and others. A detailed schedule for each district can be found separately.

Hot water shutdown in the Moscow region

The termination of hot water supply in the Moscow Region is somewhat different from the capital and may have its own characteristics. This is due to the fact that each municipality sets its own rules and deadlines for completing work.

So, if water outages in Moscow in 2019 will last from 1 to 9 days for each site, then for regional cities the period can stretch up to 14 days. Detailed information about the work schedule at addresses can be found on the official websites of municipal administrations.

Water outage in Zhukovsky

It is already known that the cessation of hot water supply in Zhukovsky will be carried out from May 16 to May 26. Hot water supply time is scheduled for 20:00. During this period, the equipment must be pressure tested, any defects in the heating networks must be identified and eliminated.

Turning off hot water in Khimki

You can get acquainted with the exact schedule of work on the official website of the Khimki City District Administration. The preliminary planned period for stopping water supply is from May 10 to August 20, 2019.

The list of boiler houses where preventive work will be carried out includes those that serve the Ivakino, Planernaya, Podrezkino, Novogorsk microdistricts and others.

Hot water shutdown in Mytishchi

Work to restore heating networks will be carried out by Mytishchi Heating Network Company. All detailed information about the period of stopping the water supply is posted at the beginning of the article.

Here you can find out the schedule for each street. They are sorted in alphabetical order with reference to the boiler room

Hot water shutdown in Zelenograd

From May to the end of August 2019, work will be carried out in Zelenograd to restore heating networks. As a result, residential buildings will be cut off from hot water supply. The maximum duration of work will be 10 days for each site.

You can find out the exact schedule by addresses for the city of Zelenograd at the beginning of the article.

Turning off hot water in Balashikha

The work in preparation for the heating season will be carried out by Balashikha Heating Networks. Detailed information on the timing and addresses of stopping the supply of hot water can be found at the beginning of the article.

Hot water outage in Korolev

The Korolev Science City will provide information on the timing and areas of preventive work as part of the notification of the population on the official website of the Administration.

The list of those subject to preventive measures includes more than 20 boiler houses. These include New Podpilki, Tekstilshchiki, Samarovka, Committee Forest, Alfa Loval, Suvorovskaya, Tarasovskaya and others.

Hot water shutdown in the city of Zheleznodorozhny

A detailed schedule and disconnection addresses can be found on the website of the city administration or the Government of the Moscow Region. Up-to-date information on this issue will be provided no later than the first days of May of this year.

The list for work will include more than 25 boiler houses. During the planned period of DHW shutdown, defects in heating networks must be identified and eliminated and prepared for the upcoming heating season.

Hot water shutdown in the city of Dolgoprudny

Accurate information on the hot water supply shutdown schedule will be provided by the City Administration. The duration of the work will not exceed 14 days.

The scheduled outage will be indicated in full days, that is, from 00:00 on the start date to 23:59 on the end date.

Why is the hot water turned off?

Water shutdowns in summer are a common occurrence. This is due to the need to carry out preventive work in preparation for the heating season.

Hydraulic tests are carried out in boiler houses and heating networks. They are aimed at:

  • assessment of the quality of repair of heating networks;
  • identifying defects and eliminating the causes of heat loss.

Turning off the water is a necessary measure. Without it, utilities will not be able to carry out the necessary work and tests. Therefore, without stopping the hot water supply, it is impossible to adequately prepare for the winter period.

- When will the hot water be turned off?

Advantages: repair of communications

Disadvantages: lack of hot water

Despite the fact that this is the age of discoveries and modern technologies, hot water shutdowns could not be avoided: every year in all Russian cities there is a shutdown of hot water supply, which, of course, brings certain inconvenience to people.

Hot water shutdown schedule 2017

Moscow city

You can find out about the shutdown of hot water in advance - many sites offer a form to fill out, in which you must indicate the address and house number. By filling out this simple form, you can get a specific answer to the question about the date the hot water supply will be turned off.

Why do water shutoffs happen every year?

This question interests many residents of both the capital and other cities.

Utility services respond that the annual shutdown of hot water is explained by a technical need for the process of preparing communications for the coming winter season.

Hot water is turned off at the beginning of autumn - when it is not yet cold outside, so as not to disturb residents too much. During this time, all district heating systems are checked.

Hot water shutdown times

Typically, hot water supply shutdown periods are short - about 10 days. If no breakdowns are detected, the central water supply system is in perfect order and can function reliably, then the hot water supply is resumed.

Just 7 years ago, hot water was turned off for 21 days. Currently, the highway inspection process has been reduced to 10 days, and this time is justified.

If problems are found during the inspection process, the hot water may be delayed. In this case, residents are informed that hot water supply will be several days later.

In some neighborhoods that were recently built, the hot water shutdown may take 1-2 days, since the pipes are in good condition and nothing needs to be repaired.

No, the cold water is not turned off completely, as it is necessary for the use of the sewer system.

The cold water supply is designed in such a way that it has a reserve, which means that residents should always have access to cold water.

Usually, when hot water is turned off, the mechanics of management companies turn off the house meters themselves. But this doesn’t always happen - they may not do it for any reason: they don’t get around to it or simply forget. Therefore, just in case, it doesn’t hurt to turn off the water so that the meter cannot add extra cubic meters.

The fact is that people continue to use the water that flows from the hot tap. The water flows cold, but the payment may well show the amount as if the person used hot water (since a hot tap was used). And hot water costs more than cold water.

What should you do if it suddenly happened that you should have already turned on the hot water, the long-awaited date has arrived, but there is still no hot water?

You can write an email to the Moscow Housing Inspectorate or contact your management company (in person or by phone). It often happens that plumbers forget to turn on hot water in a particular house, and until residents start calling, they won’t see hot water.

Since hot water is turned off every year, and the time to turn it on is often delayed, many people have bought and installed water heaters, which make life much easier.

There are different models - from small volume to impressive, it is quite possible to find a suitable option. In terms of price, they are not very expensive, even if you buy them with installation. They use a lot of electricity, but the comfort is worth it.